Skip to content
ContentLora

    Tip: press / anywhere to search.

    Explainer

    What is the P5 report, the US plan for particle physics?

    The P5 report is a 10-year strategic plan for US particle physics, written by the 2023 Particle Physics Project Prioritization Panel and approved by the High Energy Physics Advisory Panel in December 2023.[1][2] Its top priority is finishing projects already under way, such as the High-Luminosity LHC, DUNE and the Rubin Observatory. It then ranks five new projects and backs R&D toward a 10 TeV collider, possibly a muon collider in the US.[3][4][5] In July 2025 DOE and NSF ended support for CMB-S4, the plan's top-ranked new project.[6]

    Editor reviewedUpdated Explainer17 claims · 29% primaryParticle physics and cosmology, Physics, Tech policy
    Reading level: 1 passage differs; the rest is the same for everyone.

    This page summarises the 2023 report. For Europe’s equivalent plan, read the 2026 European Strategy for Particle Physics. For the collider choices behind both, read how particle colliders work and the next-collider debate.

    What P5 is

    The 2023 Particle Physics Project Prioritization Panel (P5) was asked to write a 10-year plan for US particle physics, fitted into a 20-year view of the world’s plans and two possible budgets.[1] The panel’s report went to the High Energy Physics Advisory Panel (HEPAP), which approved it in December 2023 and sent it to the Department of Energy (DOE) Office of Science and the National Science Foundation (NSF).[2]

    P5 is a HEPAP subpanel. Its 2023 charge was a 10-year strategic plan within a 20-year global strategy and two constrained budget scenarios, with the 2021 Snowmass Community Planning Exercise as an essential input.[1] The report was presented to HEPAP on 7–8 December 2023, and HEPAP approved it and strongly endorsed the plan in a transmittal letter to DOE and NSF dated 8 December 2023.[2] It builds on the 2014 P5 report, which the panel says laid the foundations for the current US programme.[7] The baseline budget followed CHIPS and Science Act levels for fiscal 2023 to 2027 and then grew 3% a year to 2033. The less favourable scenario grew 2% a year from fiscal 2024 to 2033.[8]

    The report sorts the field into three science themes, each with two “science drivers” for the next 10 to 20 years.[9]

    Priority one: finish what is being built

    The report’s highest priority, in every budget scenario, is to complete projects under construction and run ongoing experiments. These include the High-Luminosity LHC with the ATLAS and CMS detectors, the first phase of the Deep Underground Neutrino Experiment (DUNE) with the PIP-II accelerator, and the Vera C. Rubin Observatory’s LSST survey.[3]

    Five new projects, in ranked order

    P5 ranked five new major initiatives from highest to lowest priority.[4]

    1. CMB-S4, the Cosmic Microwave Background Stage IV experiment, to look back at the universe’s earliest moments.
    2. DUNE phase II, a re-envisioned second phase of DUNE.
    3. An offshore Higgs factory, an electron–positron collider built abroad to study the Higgs boson.
    4. A Generation 3 dark matter experiment sensitive enough to reach the “neutrino fog”.
    5. IceCube-Gen2, to study neutrino properties.

    On the Higgs factory, P5 endorsed a machine in Europe (including CERN) or Japan. It said the current FCC-ee and ILC designs meet its scientific requirements, and that once a project is deemed feasible, the US contribution should be comparable to its involvement in the LHC and High-Luminosity LHC.[10] Europe has since chosen the FCC-ee version of the Future Circular Collider as its preferred next collider.[11] P5 also recommended supporting DESI-II, the LHCb Upgrade II and the Belle II upgrade.[12]

    The path to 10 TeV and the Muon Shot

    P5 says studying the Higgs boson’s self-interaction needs parton collision energies of about 10 TeV or more. It recommends vigorous R&D toward a cost-effective collider at that energy, using protons, muons or possibly wakefield acceleration, and aims to be ready to build major test and demonstrator facilities within 10 years. It also says no existing technology can yet build such a machine.[13]

    The report singles out a muon collider as an attractive way to bring energy-frontier colliders back to the US. A 10 TeV muon collider would be almost exactly the size of the Fermilab campus. P5 calls the path toward one its “Muon Shot”, while saying it does not know whether a muon collider is ultimately feasible.[5] It recommends that the US join the International Muon Collider Collaboration, help define a reference design, and set the parameters of a test facility by the end of the decade.[14] The physics and the obstacles are explained in what is a muon collider.

    P5 also recommended convening a targeted panel later in the decade to make decisions about the US accelerator programme when major decisions on an offshore Higgs factory are expected.[15]

    What has changed since

    On 9 July 2025, DOE’s Office of High Energy Physics and NSF told the CMB-S4 project they had jointly decided they could no longer support it. The project began an orderly shutdown, and the agencies said they would work with the field on limited upgrades to existing experiments.[6]

    In Europe, the CERN Council’s 2026 Strategy update chose the electron–positron FCC-ee as its preferred next collider and aimed for a decision on it by 2028.[11][16] It also called for exploiting synergies with the US muon collider R&D initiative.[17]

    This page covers only the recommendations and the changes we could source. We did not track later budget decisions on each project.

    Next in the crash course

    Electron-Ion Collider (EIC)

    The Electron-Ion Collider being built at Brookhaven: what it will study, how it reuses RHIC, its cost estimates and the approvals it has passed so far.

    More in Particle physics

    Developing in Science & Energy

    Questions readers ask

    What is P5?

    The Particle Physics Project Prioritization Panel, a subpanel of the High Energy Physics Advisory Panel (HEPAP). The 2023 panel was charged with a 10-year strategic plan for US particle physics, set within a 20-year global strategy and two budget scenarios.[1][2]

    When was the report adopted?

    P5 presented it to HEPAP on 7–8 December 2023, and HEPAP approved and strongly endorsed it in a letter dated 8 December 2023.[2]

    What are its top new projects?

    In order, CMB-S4, a re-envisioned second phase of DUNE, an offshore Higgs factory, a Generation 3 dark matter experiment, and IceCube-Gen2.[4]

    Does P5 want a new collider in the US?

    It backs a Higgs factory abroad, in Europe or Japan, and R&D toward a 10 TeV collider. It calls a muon collider an attractive way to bring energy-frontier colliders back to the US and calls this its Muon Shot, while saying it does not know whether such a machine is feasible.[10][13][5]

    What happened to CMB-S4?

    On 9 July 2025 DOE and NSF told the project they could no longer support it. The project began an orderly shutdown, and the agencies said they would explore limited upgrades to existing experiments.[6]

    Sources

    · 17 claims from 5 publishers

    Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.

    1. [1]

      The 2023 Particle Physics Project Prioritization Panel (P5) was charged with a 10-year strategic plan for US particle physics, set within a 20-year global strategy and two constrained budget scenarios; the 2021 Snowmass community exercise was an essential input. reportedas of 2024-05-08

    2. [2]

      P5, a subpanel of the High Energy Physics Advisory Panel (HEPAP), presented its report to HEPAP on 7–8 December 2023; HEPAP approved it and strongly endorsed the plan in a letter to the DOE Office of Science and NSF dated 8 December 2023. reportedas of 2023-12-08

    3. [3]

      P5's highest priority in every budget scenario is to finish projects under construction and run ongoing experiments, including the HL-LHC, the first phase of DUNE with PIP-II, and the Vera C. Rubin Observatory's LSST. reportedas of 2024-05-08

    4. [4]

      P5 ranked five new major initiatives from highest to lowest priority: the Cosmic Microwave Background Stage IV experiment (CMB-S4), a re-envisioned second phase of DUNE, an offshore electron-positron Higgs factory, a Generation 3 dark matter experiment reaching the neutrino fog, and IceCube-Gen2 for studying neutrino properties. reportedas of 2024-05-08

    5. [5]

      P5 called a muon collider an attractive option for bringing energy-frontier colliders back to the US, noted that a 10 TeV muon collider's footprint is almost exactly the size of the Fermilab campus, and named the path toward one its "Muon Shot", while saying it does not know if a muon collider is ultimately feasible. reportedas of 2024-05-08

    6. [6]

      On 9 July 2025, DOE's Office of High Energy Physics and NSF told the CMB-S4 project they had jointly decided they could no longer support it; the project began an orderly shutdown, and the agencies said they would explore limited upgrades to existing CMB experiments. confirmedas of 2025-07-09

    7. [7]

      The report says the 2014 P5 report laid the foundations for the current US particle physics programme. reportedas of 2024-05-08

    8. [8]

      P5's baseline budget scenario followed the CHIPS and Science Act levels for fiscal 2023 to 2027 and then rose 3% a year to 2033; the less favourable scenario rose 2% a year from fiscal 2024 to 2033. reportedas of 2024-05-08

    9. [9]

      The P5 report groups the field into three science themes, each with two science drivers to pursue over the next 10 to 20 years. confirmedas of 2024-05-08

      • 2023 P5 Report · US Particle Physics (usparticlephysics.org) · Primary source (retrieved 2026-11-22)
      • 2023 P5 Report · US Particle Physics (usparticlephysics.org) · Primary source (retrieved 2026-11-22)
    10. [10]

      P5 endorsed an offshore Higgs factory in Europe (including CERN) or Japan, said the FCC-ee and ILC designs meet its scientific requirements, and recommended a US contribution comparable to its LHC and HL-LHC involvement once a project is deemed feasible. reportedas of 2024-05-08

    11. [11]

      The 2026 Strategy update recommends the electron–positron Future Circular Collider (FCC-ee) as the preferred option for CERN's next flagship collider. confirmedas of 2026-05-22

    12. [12]

      P5 recommended supporting DESI-II, the LHCb Upgrade II and the Belle II upgrade. reportedas of 2024-05-08

    13. [13]

      P5 said precision studies of the Higgs self-interaction and searches for new spinless particles related to the Higgs need parton collision energies of about 10 TeV or more. It recommended vigorous R&D toward a cost-effective 10 TeV parton centre-of-momentum collider based on proton, muon or possibly wakefield technology, aiming to be ready to build major test and demonstrator facilities within 10 years, and said no technology yet exists to build such a machine. reportedas of 2024-05-08

    14. [14]

      P5 recommended that the US join the International Muon Collider Collaboration and take a leading role in defining a reference design, with R&D to set the parameters of a muon collider test facility by the end of the decade. reportedas of 2024-05-08

    15. [15]

      P5 recommended convening a targeted panel later in the decade to make decisions on the US accelerator-based programme when major decisions on an offshore Higgs factory are expected. reportedas of 2024-05-08

    16. [16]

      CERN Management is to report annually for two years so that the CERN Council can decide on the FCC-ee by 2028, taking into account feasibility, funding and public consultations in France and Switzerland. confirmedas of 2026-05-22

    17. [17]

      The CERN Council's 2026 European Strategy update says technologies for bright muon beams should be supported at an appropriate level as longer-term R&D, and that synergies with the US muon collider R&D initiative should be exploited. confirmedas of 2026-05-22

    Revision history (1)
    1. Page created.

    Created Nov 22, 2026. Last reviewed by an editor on Nov 22, 2026. Next scheduled review: Apr 26, 2027.

    Cite this page

    "What is the P5 report, the US plan for particle physics?." ContentLora, updated Nov 22, 2026. https://contentlora.com/explain/us-particle-physics-roadmap-p5

    Spotted an error? Suggest a correction or emailcorrections@contentlora.com.