STEP Fusion Programme: UK Prototype Fusion Power Plant
Also known as STEP, STEP Fusion, Spherical Tokamak for Energy Production
STEP (Spherical Tokamak for Energy Production) is the UK's programme to build a prototype fusion power plant at the former West Burton coal power station in Nottinghamshire, designed to demonstrate putting net electricity on the grid.[1][2] It is led by UK Fusion Energy, a subsidiary of the UK Atomic Energy Authority, and the plant is expected to begin operating in 2040.[3][4][5]
Key facts
What it is
STEP stands for Spherical Tokamak for Energy Production. Its stated mission is to generate net energy from fusion with a prototype power plant shaped as a spherical tokamak, supplying the grid, and to stimulate an industry that proves fusion’s commercial viability.[2] The UK government says the plant is designed to demonstrate putting net electricity on the grid and to pave the way for commercial fusion plants.[1] It also aims to show fuel self-sufficiency and a workable way to maintain the plant.[6]
West Burton
In October 2022 the government confirmed the West Burton coal power station site in north Nottinghamshire as STEP’s home.[1] The choice followed almost two years of assessment. Fifteen sites were long-listed from an open call in December 2020 and five were shortlisted; the others were Ardeer, Moorside, Goole and Severn Edge.[7] UK Fusion Energy reported in 2026 that it had acquired part of the West Burton site.[8]
Who delivers it
Leadership of STEP passed on 1 November 2024 to UK Industrial Fusion Solutions, a wholly owned subsidiary of the UK Atomic Energy Authority. It was set up to lead a public-private partnership to design, build and operate the plant, with UKAEA as fusion partner alongside engineering and construction partners.[3] The company has since been renamed UK Fusion Energy.[4] In March 2026 the government announced that the company would appoint ILIOS, a consortium led by a Kier and Nuvia joint venture, as construction partner under a contract valued at 200 million pounds.[9] Its 2025/26 annual report named Tokamak Energy as the first system partner.[8] On 12 November 2026 it launched a procurement worth up to 115 million pounds for five system partners. These cover the breeder blanket, the fuel cycle, test operations, the control system, and whole-plant integration.[10]
Funding and timeline
UK Fusion Energy says government funding for fusion is 2.5 billion pounds over five years, about 1.3 billion pounds of it for STEP, and that it invested nearly 120 million pounds in design in 2025/26.[8] Its April 2026 strategy says the plant is expected to begin operations in 2040. When the site was chosen in 2022, UKAEA was targeting first operations in the early 2040s.[5]
The design
At the SOFT 2026 fusion technology symposium, STEP presented SPP3, the third generation of its prototype plant design. The programme stressed a spherical tokamak designed for steady-state rather than pulsed operation and more efficient gyrotron heating. It also described a vertical maintenance strategy with a “stacked rings” architecture.[11] Other tokamaks designed for fusion gain include ITER in France and SPARC in the US.[12][13] Milestones are followed in the fusion energy tracker.
Read next
Next in the crash course
Tokamak Energy
Tokamak Energy is a UK spherical-tokamak and superconducting-magnet company. Its ST40 machine, Demo4 magnets, STEP contract and US milestone award.
Questions readers ask
What is STEP fusion?
STEP, the Spherical Tokamak for Energy Production, is a UK programme to build a prototype fusion plant that demonstrates putting net electricity on the grid. Its stated mission is to generate net energy from fusion and help prove the technology's commercial viability.[1][2]
Where will STEP be built?
At the West Burton power station site in north Nottinghamshire, a former coal plant. It was chosen in October 2022 from a shortlist of five sites that also included Ardeer, Moorside, Goole and Severn Edge.[1][7]
When will STEP start operating?
UK Fusion Energy's 2026 strategy says the plant is expected to begin operations in 2040. When the site was chosen in 2022, UKAEA was targeting the early 2040s.[5]
Who is building STEP?
UK Fusion Energy, a wholly owned subsidiary of UKAEA, leads the programme, with UKAEA as fusion partner. ILIOS, a consortium led by a Kier and Nuvia joint venture, was announced as construction partner in March 2026, and Tokamak Energy is the first system partner.[3][9][8]
How much is the UK spending on STEP?
UK Fusion Energy says government funding for fusion is 2.5 billion pounds over five years, with about 1.3 billion pounds of that for STEP, and that it invested nearly 120 million pounds in design in 2025/26.[8]
Sources
· 13 claims from 5 publishers
Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.
- [1]
In October 2022 the UK government confirmed the West Burton coal power station site in north Nottinghamshire as the home of STEP, a prototype fusion plant meant to demonstrate putting net electricity on the grid. confirmedas of 2022-10-06
- West Burton selected as home of STEP fusion plant · GOV.UK · Primary source · 2022-10-06 (retrieved 2026-11-21)
- West Burton selected as home of STEP fusion plant · GOV.UK · Primary source · 2022-10-06 (retrieved 2026-11-21)
- [2]
STEP stands for Spherical Tokamak for Energy Production; its stated mission is to generate net energy from fusion with a spherical prototype tokamak plant that supplies the grid, and to stimulate an industry that proves fusion's commercial viability. confirmedas of 2026-11-21
- [3]
On 1 November 2024 leadership of STEP passed to UK Industrial Fusion Solutions, a wholly owned subsidiary of the UK Atomic Energy Authority set up to lead a public-private partnership to design, build and operate the plant, with UKAEA as fusion partner alongside engineering and construction partners. confirmedas of 2024-11-01
- UK Industrial Fusion Solutions stands-up to deliver STEP · GOV.UK · Primary source · 2024-11-01 (retrieved 2026-11-21)
- UK Industrial Fusion Solutions stands-up to deliver STEP · GOV.UK · Primary source · 2024-11-01 (retrieved 2026-11-21)
- [4]
UK Industrial Fusion Solutions has since been renamed UK Fusion Energy. confirmedas of 2026-11-21
- UK Industrial Fusion Solutions · GOV.UK · Primary source (retrieved 2026-11-21)
- [5]
UK Fusion Energy's April 2026 strategy says the STEP plant at West Burton is expected to begin operations in 2040; when the site was chosen in 2022, UKAEA was targeting first operations in the early 2040s. confirmedas of 2026-04-20· forecast
- UK Fusion Energy Ltd (UKFE) Strategy · GOV.UK · Primary source · 2026-04-20 (retrieved 2026-11-21)
- West Burton selected as home of STEP fusion plant · GOV.UK · Primary source · 2022-10-06 (retrieved 2026-11-21)
- [6]
STEP aims to demonstrate net energy, fuel self-sufficiency and a viable route to plant maintenance. confirmedas of 2024-11-01
- UK Industrial Fusion Solutions stands-up to deliver STEP · GOV.UK · Primary source · 2024-11-01 (retrieved 2026-11-21)
- [7]
West Burton was chosen after a process of almost two years in which 15 sites were long-listed from an open call in December 2020 and five were shortlisted, the others being Ardeer, Moorside, Goole and Severn Edge. confirmedas of 2022-10-06
- West Burton selected as home of STEP fusion plant · GOV.UK · Primary source · 2022-10-06 (retrieved 2026-11-21)
- West Burton selected as home of STEP fusion plant · GOV.UK · Primary source · 2022-10-06 (retrieved 2026-11-21)
- [8]
UK Fusion Energy's 2025/26 annual report, as summarised by the company, says it invested nearly 120 million pounds in design, appointed Tokamak Energy as the first system partner, acquired part of the West Burton site, and noted government funding of 2.5 billion pounds for fusion over five years, about 1.3 billion of it for STEP. confirmedas of 2026-11-21
- UK fusion power plant programme achieves major delivery milestones while backing British business · UK Fusion Energy (STEP Fusion) · Primary source (retrieved 2026-11-21)
- UK fusion power plant programme achieves major delivery milestones while backing British business · UK Fusion Energy (STEP Fusion) · Primary source (retrieved 2026-11-21)
- UK fusion power plant programme achieves major delivery milestones while backing British business · UK Fusion Energy (STEP Fusion) · Primary source (retrieved 2026-11-21)
- [9]
In March 2026 the government announced that UK Industrial Fusion Solutions would appoint ILIOS, a consortium led by a Kier and Nuvia joint venture, as STEP's construction partner under a contract valued at 200 million pounds, with planned operation in 2040. confirmedas of 2026-03-16
- ILIOS appointment speeds delivery of STEP Fusion at West Burton · GOV.UK · Primary source · 2026-03-16 (retrieved 2026-11-21)
- ILIOS appointment speeds delivery of STEP Fusion at West Burton · GOV.UK · Primary source · 2026-03-16 (retrieved 2026-11-21)
- ILIOS appointment speeds delivery of STEP Fusion at West Burton · GOV.UK · Primary source · 2026-03-16 (retrieved 2026-11-21)
- ILIOS appointment speeds delivery of STEP Fusion at West Burton · GOV.UK · Primary source · 2026-03-16 (retrieved 2026-11-21)
- [10]
On 12 November 2026 UK Fusion Energy launched a procurement worth up to 115 million pounds for five STEP system partners, covering the breeder blanket, the fuel cycle, test operations, the control system, and systems engineering and whole-plant integration. confirmedas of 2026-11-12
- UK Fusion Energy launches £115m procurement programme for five STEP System Partners · UK Fusion Energy (STEP Fusion) · Primary source · 2026-11-12 (retrieved 2026-11-21)
- UK Fusion Energy launches £115m procurement programme for five STEP System Partners · UK Fusion Energy (STEP Fusion) · Primary source · 2026-11-12 (retrieved 2026-11-21)
- UK Fusion Energy launches £115m procurement programme for five STEP System Partners · UK Fusion Energy (STEP Fusion) · Primary source · 2026-11-12 (retrieved 2026-11-21)
- [11]
At the SOFT 2026 symposium STEP presented SPP3, the third generation of its prototype plant design, stressing a spherical tokamak designed for steady-state rather than pulsed operation, more efficient gyrotron heating, and a vertical maintenance strategy with a stacked-rings architecture. confirmedas of 2026-11-21
- STEP Fusion unveils next-generation fusion powerplant design at SOFT 2026 · UK Fusion Energy (STEP Fusion) · Primary source (retrieved 2026-11-21)
- STEP Fusion unveils next-generation fusion powerplant design at SOFT 2026 · UK Fusion Energy (STEP Fusion) · Primary source (retrieved 2026-11-21)
- STEP Fusion unveils next-generation fusion powerplant design at SOFT 2026 · UK Fusion Energy (STEP Fusion) · Primary source (retrieved 2026-11-21)
- [12]
ITER is designed to demonstrate the scientific and technological feasibility of fusion power and will be the world's largest experimental fusion facility; its mission goals are to demonstrate integration of systems for industrial-scale fusion, reach Q of at least 10, and eventually reach Q of at least 5 in steady state. confirmedas of 2026-10-10
- Press conference summary: updated ITER baseline (presentation by the Director-General) · ITER Organization · Primary source · 2024-07-03 (retrieved 2026-10-10)
- Press conference summary: updated ITER baseline (presentation by the Director-General) · ITER Organization · Primary source · 2024-07-03 (retrieved 2026-10-10)
- Press conference summary: updated ITER baseline (presentation by the Director-General) · ITER Organization · Primary source · 2024-07-03 (retrieved 2026-10-10)
- [13]
In a company blog post current as of October 2026, CFS said it would start operating SPARC "in coming months" and that SPARC is designed to reach Q>10, so Q>1 is not an extremely difficult milestone; CFS has not published a dated first-plasma target. reportedas of 2026-10-10
- Why CFS is confident we will demonstrate net fusion energy: Q>1 · Commonwealth Fusion Systems (The Tokamak Times) · Primary source (retrieved 2026-10-10)
- Why CFS is confident we will demonstrate net fusion energy: Q>1 · Commonwealth Fusion Systems (The Tokamak Times) · Primary source (retrieved 2026-10-10)
Revision history (1)
- Page created.
Created Nov 21, 2026. Last reviewed by an editor on Nov 22, 2026. Next scheduled review: Jun 15, 2027.
Cite this page
"STEP Fusion Programme: UK Prototype Fusion Power Plant." ContentLora, updated Nov 21, 2026. https://contentlora.com/wiki/step-fusion-programme
Spotted an error? Suggest a correction or emailcorrections@contentlora.com.