Analysis
How much power will AI need? Comparing the forecasts
Forecasters agree that data center electricity use is rising fast, but not on how fast. The IEA projects about 950 TWh in 2030, while Gartner expects more than 1,200 TWh.[1][2] Even the starting point differs: 485 TWh for 2025 in the IEA's estimate against 447 TWh in Gartner's.[1][3] Supply bottlenecks, possibly speculative grid requests and financing conditions all add uncertainty. The IEA says the bottlenecks make its more aggressive near-term scenarios less likely.[4][5][6]
The forecasters compared here all expect data center electricity use to keep rising, driven by AI. The IEA estimates 17% growth in 2025, and Gartner expects 26% in 2026.[7][3] They disagree on how far and how fast. This page compares the main forecasts and the reasons they differ.
Forecasts here are attributed to the organisations that made them. They are not ours. For background on why AI uses so much power, read AI data centers and electricity, explained. For dated developments, see the AI data center power tracker.
The global forecasts side by side
The two main estimates of where demand stands today differ. The IEA estimates data centers used 485 TWh in 2025, after 17% growth that year.[1][7] Gartner puts 2025 at 447 TWh.[3] The IEA says its central path is close to the one in its 2025 report.[8]
These projections belong to the organisations named:
- IEA (April 2026): about 950 TWh in 2030, around 3% of world electricity demand, with AI-focused data centers tripling between 2025 and 2030.[1][9]
- Gartner (reported July 2026): 565 TWh in 2026 and more than 1,200 TWh by 2030.[3][2] AI-optimised servers use 175 TWh in 2026 and 258 TWh in 2027, when they overtake conventional servers.[10] In capacity terms, power demand rises 27% in 2026 to about 132-133 GW.[11]
- IEA scenario range (2025): 700 to 1,700 TWh in 2035.[12]
United States forecasts
The US is the largest market. It had 45% of global data center electricity use in 2024, according to the IEA.[13] Berkeley Lab’s December 2024 report for the Department of Energy found US data centers used 176 TWh in 2023, or 4.4% of US electricity.[14][15]
US projections, attributed:
- Gartner: about 204 TWh in 2026, 36% of the world total.[16]
- Berkeley Lab (December 2024): 325 to 580 TWh by 2028, or 6.7% to 12% of US electricity.[14][15]
- EPRI: as much as 17% of US electricity by 2030.[17]
- Goldman Sachs (May 2026): 66 GW of data center power demand in 2027, up from 31 GW in 2025.[18]
- NERC (January 2026): summer peak demand up 24% over ten years, mostly from data centers.[19]
- EIA (October 2026): commercial-sector demand, which includes data centers, up 2.8% in 2027.[20]
Why the numbers differ
Supply constraints are one reason. The IEA says bottlenecks across the AI value chain are making its more aggressive near-term scenarios less likely.[4] It reported a high-bandwidth memory shortage expected to last until at least the end of 2027.[21] Gas turbine orders rose 70% in 2025, and the IEA estimated in 2025 that around 20% of planned data centers could face grid delays.[22][23] A Gartner analyst told Network World that its forecast accounts for parts shortages, delayed or cancelled projects and the conflict with Iran.[24]
Queues are another. Texas Governor Greg Abbott said requests in ERCOT’s queue totalled about 474 GW, more than five times its record peak.[25] Experts quoted by Utility Dive say much of that may be speculative or duplicative.[5] Even real projects are hard to size. The IEA notes that sites fill gradually and often oversize their grid connections at first.[26]
Money is a third. The IEA says data center investment has grown too large for company balance sheets, so growth will be sensitive to market sentiment and financing.[6]
Forecasts that count announced projects or connection requests can run high, because some of those projects may never be built. Forecasts that model chip supply and equipment lead times can run lower in the near term. The 2025 baselines also differ by almost 40 TWh, which suggests the organisations define or measure data center use differently. Comparing growth rates, rather than absolute totals, removes part of that gap.
Prices, flexibility and risk
The IEA says new data center load can raise prices where supply is tight but lower them where there is spare capacity.[27] The EIA forecasts 2026 wholesale prices in the PJM region 41% above 2025, the largest rise of any region it tracks.[28] A 2026 Duke University study found that trimming data center peak demand by 1% to 2% could cut rates by 0.5% to 2.8%.[29] Experts quoted by Utility Dive warn that utilities and ratepayers could be left with stranded investments, and that in a market correction data centers could crash out of their tariff arrangements.[30]
These are the signposts named by the forecasters themselves, not predictions of ours:
- whether bottlenecks in memory chips, gas turbines and grid equipment ease, which the IEA says could raise the upside case after 2030[31][21]
- whether AI servers overtake conventional servers in 2027, as Gartner projects[10]
- how many projects in ERCOT’s queue survive the state audit, which ERCOT aims to finish by December 10, 2026[32]
- the EIA’s next short-term outlook, scheduled for November 10, 2026[33]
Competing views
Steady doubling
The IEA's central case has global data center use roughly doubling from 485 TWh in 2025 to 950 TWh in 2030, close to its 2025 trajectory. It says bottlenecks across the AI value chain make faster near-term growth less likely.[1][8][4]
Read next
You've reached the end of the course. Next crash course
Climate science and carbon removal in 2026: a crash course
A sourced crash course on climate science and carbon removal: warming, carbon budgets, tipping points, direct air capture, markets and the 2026 frontier.
Questions readers ask
Why do the IEA and Gartner disagree about data center electricity use?
They start from different 2025 estimates, 485 TWh for the IEA and 447 TWh for Gartner, and project different paths. The IEA expects about 950 TWh in 2030 and Gartner more than 1,200 TWh. The IEA says supply bottlenecks make its faster near-term scenarios less likely.[1][3][2][4]
What share of US electricity could data centers use?
Berkeley Lab estimated 4.4% in 2023 and projected 6.7% to 12% by 2028. EPRI found data centers could reach as much as 17% of US electricity by 2030.[15][17]
Are grid connection queues a good guide to future demand?
Not on their own. Requests in Texas's ERCOT grid totalled about 474 GW, more than five times its record peak, according to Governor Greg Abbott, and experts quoted by Utility Dive say much of that may be speculative or duplicative.[25][5]
How wide is the range of long-term forecasts?
Across the IEA's 2025 scenarios, global data center demand in 2035 ranges from 700 to 1,700 TWh.[12]
Could AI's power demand turn out lower than expected?
The IEA says the pace depends on market sentiment and financing, because data center investment is too large for company balance sheets alone. Experts quoted by Utility Dive warn that in a market correction, data centers could crash out of their tariff arrangements.[6][30]
Sources
· 33 claims from 6 publishers
Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.
- [1]
The IEA's April 2026 projection has data centre electricity use roughly doubling from 485 TWh in 2025 to 950 TWh in 2030, about 3% of global electricity demand. confirmedas of 2026-04-16· forecast
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: Our updated data centre electricity demand outlook (retrieved 2026-11-07)
- [2]
Gartner expects data centre electricity use to exceed 1,200 TWh by 2030 and warns that grid supply will be insufficient for planned construction. confirmedas of 2026-07-09· forecast
- Gartner: Data center electricity consumption to grow 26% in 2026 · Network World · Secondary source · 2026-07-07 · Body (retrieved 2026-11-07)
- AI servers will consume more power than all conventional data center hardware combined by 2027, Gartner forecasts · Tom's Hardware · Secondary source · 2026-07-09 · Standfirst (retrieved 2026-11-07)
- [3]
A Gartner forecast reported in July 2026 projects that global data centre electricity use will reach 565 TWh in 2026, up 26% from 447 TWh in 2025. confirmedas of 2026-07-09· forecast
- Gartner: Data center electricity consumption to grow 26% in 2026 · Network World · Secondary source · 2026-07-07 · First paragraph (retrieved 2026-11-07)
- AI servers will consume more power than all conventional data center hardware combined by 2027, Gartner forecasts · Tom's Hardware · Secondary source · 2026-07-09 · First paragraph (retrieved 2026-11-07)
- [4]
The IEA judges that bottlenecks across the AI value chain make its more aggressive near-term scenarios less likely, despite booming investment and project pipelines. confirmedas of 2026-04-16· interpretation
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: Our updated data centre electricity demand outlook (retrieved 2026-11-07)
- [5]
Experts quoted by Utility Dive say a substantial portion of ERCOT's large-load queue may be speculative or duplicative. reportedas of 2026-08-21· interpretation
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: ERCOT aims to complete Texas governor's data center audit by December (Aug. 21, 2026) (retrieved 2026-11-07)
- [6]
The IEA says data centre investment has grown too large for company balance sheets alone, so the pace of growth in data centre energy use will be sensitive to market sentiment and financing conditions. confirmedas of 2026-04-16· interpretation
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: Across the AI value chain, a scramble for electricity (retrieved 2026-11-07)
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: Across the AI value chain, a scramble for electricity (retrieved 2026-11-07)
- [7]
The IEA estimates that global electricity demand from data centres grew 17% in 2025, in line with its earlier projections. confirmedas of 2026-04-16
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Executive summary, opening section (retrieved 2026-11-07)
- [8]
The IEA said in April 2026 that its central projection for data centre electricity demand remained close to the trajectory in its 2025 report. confirmedas of 2026-04-16
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: Our updated data centre electricity demand outlook (retrieved 2026-11-07)
- [9]
The IEA projects that electricity use by AI-focused data centres will triple between 2025 and 2030, much faster than data centres overall. confirmedas of 2026-04-16· forecast
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: Our updated data centre electricity demand outlook (retrieved 2026-11-07)
- [10]
Gartner estimates that AI-optimised servers account for 31% of data centre electricity use in 2026, up from about 20% a year earlier, rising from 95 TWh in 2025 to 175 TWh in 2026 and 258 TWh in 2027, when they would overtake conventional servers. confirmedas of 2026-07-09· forecast
- Gartner: Data center electricity consumption to grow 26% in 2026 · Network World · Secondary source · 2026-07-07 · Body (retrieved 2026-11-07)
- Gartner: Data center electricity consumption to grow 26% in 2026 · Network World · Secondary source · 2026-07-07 · Body (retrieved 2026-11-07)
- AI servers will consume more power than all conventional data center hardware combined by 2027, Gartner forecasts · Tom's Hardware · Secondary source · 2026-07-09 · Body (retrieved 2026-11-07)
- [11]
Gartner forecast worldwide data centre power demand rising 27% in 2026, to 133 GW from 105 GW according to Network World, or to 132 GW from 104 GW according to Tom's Hardware. confirmedas of 2026-07-09· forecast
- Gartner: Data center electricity consumption to grow 26% in 2026 · Network World · Secondary source · 2026-07-07 · Body (retrieved 2026-11-07)
- AI servers will consume more power than all conventional data center hardware combined by 2027, Gartner forecasts · Tom's Hardware · Secondary source · 2026-07-09 · Body (retrieved 2026-11-07)
- [12]
Across the IEA's 2025 scenarios, data centre electricity demand in 2035 ranges from 700 to 1,700 TWh. confirmedas of 2025-04-10· forecast
- Energy and AI - Executive summary · International Energy Agency · Primary source · 2025-04-10 · Executive summary (retrieved 2026-11-07)
- [14]
The LBNL report found US data centre electricity use rose from 58 TWh in 2014 to 176 TWh in 2023, and estimated 325 to 580 TWh by 2028. confirmedas of 2024-12-20· forecast
- DOE Releases New Report Evaluating Increase in Electricity Demand from Data Centers · US Department of Energy · Primary source · 2024-12-20 · Report summary (retrieved 2026-11-07)
- [16]
Gartner estimates that the United States accounts for about 204 TWh, or 36%, of global data centre electricity use in 2026. confirmedas of 2026-07-09· forecast
- Gartner: Data center electricity consumption to grow 26% in 2026 · Network World · Secondary source · 2026-07-07 · Body (retrieved 2026-11-07)
- AI servers will consume more power than all conventional data center hardware combined by 2027, Gartner forecasts · Tom's Hardware · Secondary source · 2026-07-09 · Body (retrieved 2026-11-07)
- [17]
EPRI found that data centres could use as much as 17% of US electricity by 2030, with growth varying widely by state. reportedas of 2026-06-26· forecast
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: Data centers are ready to negotiate flexibility for speed (June 26, 2026) (retrieved 2026-11-07)
- [18]
Goldman Sachs projected in May 2026 that US data centre power demand would reach 66 GW in 2027, up from 31 GW in 2025. reportedas of 2026-06-26· forecast
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: Data centers are ready to negotiate flexibility for speed (June 26, 2026) (retrieved 2026-11-07)
- [19]
NERC's Long-Term Reliability Assessment, published in January 2026, expects summer peak demand to rise 24% over ten years, with data centres accounting for most of the increase. reportedas of 2026-05-05· forecast
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: NERC issues Level 3 alert (May 5, 2026) (retrieved 2026-11-07)
- [20]
The EIA forecasts US commercial-sector electricity demand, which includes data centres, to grow 2.8% in 2027. confirmedas of 2026-10-06· forecast
- Short-Term Energy Outlook, October 2026 - Electricity, coal, and renewables · US Energy Information Administration · Primary source · 2026-10-06 · Electricity prices and consumption (retrieved 2026-11-07)
- [21]
The IEA reported in April 2026 that a shortage of high-bandwidth memory, used in AI chips, had developed over the previous six months and was expected to last at least until the end of 2027. confirmedas of 2026-04-16
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: Across the AI value chain, a scramble for electricity (retrieved 2026-11-07)
- [22]
The IEA says gas turbine orders surged 70% in 2025, exposing chokepoints in energy equipment supply chains. confirmedas of 2026-04-16
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: In an unstable world, the links between AI and energy security have tightened (retrieved 2026-11-07)
- [23]
The IEA estimated in 2025 that around 20% of planned data centre projects could face delays unless grid risks are addressed. confirmedas of 2025-04-10· forecast
- Energy and AI - Executive summary · International Energy Agency · Primary source · 2025-04-10 · Executive summary (retrieved 2026-11-07)
- [24]
According to Network World, Gartner analyst Linglan Wang said the forecast accounts for parts and supply shortages, delayed or cancelled projects and the impact of the conflict with Iran. reportedas of 2026-07-07
- Gartner: Data center electricity consumption to grow 26% in 2026 · Network World · Secondary source · 2026-07-07 · Body (retrieved 2026-11-07)
- [25]
On August 3, 2026 Texas Governor Greg Abbott called for an audit of all data centres in ERCOT's interconnection queue, pausing new connections; he said queue requests totalled about 474 GW, more than five times ERCOT's record peak, and about 90% were data centres. reportedas of 2026-08-05
- Texas hits pause on data center interconnections · Utility Dive · Secondary source · 2026-08-05 · Dive Brief (retrieved 2026-11-07)
- Texas hits pause on data center interconnections · Utility Dive · Secondary source · 2026-08-05 · Dive Brief (retrieved 2026-11-07)
- [26]
The IEA notes that actual data centre peak load is often uncertain, because sites fill with servers gradually and often oversize their grid connections at first. confirmedas of 2026-04-16
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: with the right conditions, data centres do not necessarily raise electricity prices (retrieved 2026-11-07)
- [27]
The IEA says data centre load growth can raise electricity prices where supply is tight, but can lower them where there is spare supply, by using power plants and grids more efficiently. confirmedas of 2026-04-16· interpretation
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: with the right conditions, data centres do not necessarily raise electricity prices (retrieved 2026-11-07)
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: with the right conditions, data centres do not necessarily raise electricity prices (retrieved 2026-11-07)
- [28]
In its October 2026 Short-Term Energy Outlook, the EIA forecast 2026 wholesale electricity prices in the PJM region 41% higher than in 2025, the largest increase of any region it tracks. confirmedas of 2026-10-06· forecast
- Short-Term Energy Outlook, October 2026 - Electricity, coal, and renewables · US Energy Information Administration · Primary source · 2026-10-06 · Electricity prices and consumption (retrieved 2026-11-07)
- [29]
A 2026 Duke University Nicholas Institute study found that cutting data centre peak demand by 1% to 2% could lower electricity rates by 0.5% to 2.8%. reportedas of 2026-06-26
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: Data centers are ready to negotiate flexibility for speed (June 26, 2026) (retrieved 2026-11-07)
- [30]
Utility Dive reported experts warning that utilities and their ratepayers could be left exposed to stranded investments, and that in a market correction data centres could crash out of their tariff arrangements. reportedas of 2026-03-06· interpretation
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: Utilities are spending billions on the data center boom (March 6, 2026) (retrieved 2026-11-07)
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: Utilities are spending billions on the data center boom (March 6, 2026) (retrieved 2026-11-07)
- [31]
The IEA says investment to relieve equipment and chip bottlenecks, and fast uptake of energy-intensive AI uses, raise the prospect of an even higher upside case after 2030. confirmedas of 2026-04-16· forecast
- Key Questions on Energy and AI - Executive summary · International Energy Agency · Primary source · 2026-04-16 · Section: Our updated data centre electricity demand outlook (retrieved 2026-11-07)
- [32]
ERCOT said in August 2026 that it aimed to audit hundreds of data centre proposals by December 10, a step needed before large-load connections can resume; about 300 data centres of 75 MW or more are in its Batch Zero study process. reportedas of 2026-08-21
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: ERCOT aims to complete Texas governor's data center audit by December (Aug. 21, 2026) (retrieved 2026-11-07)
- Trendline: Data Centers and the US Grid · Utility Dive · Secondary source · Article: ERCOT aims to complete Texas governor's data center audit by December (Aug. 21, 2026) (retrieved 2026-11-07)
- [33]
The EIA's next Short-Term Energy Outlook is scheduled for November 10, 2026. confirmedas of 2026-11-07
- Short-Term Energy Outlook, October 2026 - Electricity, coal, and renewables · US Energy Information Administration · Primary source · 2026-10-06 · Page header (retrieved 2026-11-07)
Revision history (1)
- Page created.
Created Nov 7, 2026. Last reviewed by an editor on Nov 8, 2026. Next scheduled review: Jan 15, 2027.
Cite this page
"How much power will AI need? Comparing the forecasts." ContentLora, updated Nov 7, 2026. https://contentlora.com/analysis/ai-power-demand-forecasts-debate
Spotted an error? Suggest a correction or emailcorrections@contentlora.com.