Skip to content
ContentLora

    Tip: press / anywhere to search.

    Explainer

    How wind power works

    Wind turbines use the lift created by moving air to spin blades that drive a generator.[1] Wind supplied about 10.5% of US utility-scale electricity in 2025 and a record 158.7 GW was added worldwide, while US offshore wind spent 2025-26 in court after federal stop-work orders.[2][3][4][5]

    Editor reviewedUpdated Explainer31 claims · 74% primaryEnergy and climate, Science
    Reading level: 1 passage differs; the rest is the same for everyone.

    This explainer covers how wind turbines work, how onshore and offshore wind differ, how wind fits into the grid, and the federal actions and court cases affecting US offshore wind in 2025 and 2026. Court cases are described as the tracker and trade press report them; several are still pending.

    How a wind turbine works

    A wind turbine’s blades work like aircraft wings: moving air creates lift that turns them, and they spin a shaft connected to a generator.[1] Almost all turbines in use have a horizontal axis, usually with three blades.[6] Longer blades capture more energy, so blade length matters most for output.[7]

    Turbines range from about 10 kW home units to the largest operating machines of about 15 MW, and blade length is the biggest single factor in output.[7] Nearly all operating turbines are horizontal-axis designs.[6] The EIA says good sites for utility-scale turbines have average wind speeds of at least 13 mph (5.8 m/s), and wind speed generally rises with height.[8]

    Variability and capacity factor

    Wind speeds change through the day and with the seasons.[9] In California and Montana, the EIA notes, the seasonal pattern happens to line up with when people use the most electricity.[9] A plant’s capacity factor measures how much it actually produces compared with its maximum.[10] US wind farms averaged 33.8% in 2025, higher than solar PV at 24.0% but far below nuclear at 91.1%.[11] Grid operators must keep supply and demand matched at every moment, so this variability has to be balanced by other resources.[12] The IEA says demand-side flexibility, storage and dispatchable power plants will increasingly be needed to integrate wind and solar.[13]

    Onshore wind: growth and costs

    By IRENA’s estimates, new onshore wind is cheaper than new solar PV: it averaged USD 33 per MWh in 2025, down 4%, against USD 44 for solar PV.[14] IRENA counted record global wind additions of 158.7 GW in 2025, with China adding 119.4 GW.[3] The IEA expects global wind capacity to nearly double to more than 2,000 GW by 2030, despite supply chain problems, rising costs and permitting delays.[15] China dominates the mining and refining of the rare earths used in large turbine magnets.[16]

    In the US, wind generation grew from about 6 billion kWh in 2000 to about 464 billion kWh in 2025, about 10.5% of utility-scale electricity.[2] That made wind the largest renewable source, with 43% of renewable generation.[17] Projects in 43 states produced power, and Texas, Iowa, Oklahoma, Kansas and Illinois generated about 52% of it.[18] Developers planned 11.8 GW of US wind for 2026, more than double the 2025 figure, including the 3,650 MW SunZia project in New Mexico.[19]

    Offshore wind

    Electricity from offshore wind costs more: IRENA estimates new offshore wind averaged USD 78 per MWh in 2025, down 3%.[14] European countries and China lead the world in offshore capacity.[20] The US Department of Energy puts the technical resource in US federal waters and the Great Lakes at more than 4,000 GW, though not all of it could realistically be developed.[21] At the end of 2024 the US had two operating offshore projects, South Fork (130 MW) off New York and Vineyard Wind 1, with 174 MW then operating.[22] The IEA cut its global five-year offshore growth forecast by more than 25%, citing the US policy shift and cancellations and delays in Europe, Japan and India.[23]

    US offshore wind and the courts, 2025-2026

    On 20 January 2025 a presidential memorandum withdrew offshore areas from wind leasing, ordered a review of existing leases and told agencies not to issue new or renewed approvals for onshore or offshore wind projects.[24] On 8 December 2025 the federal district court in Massachusetts, ruling in a suit brought by a coalition of states led by New York, vacated the resulting pause in wind permitting and held that it violated the Administrative Procedure Act.[24] New York’s Attorney General said in June 2026 that the federal government had dropped its appeal.[25] In August 2025 the Bureau of Ocean Energy Management (BOEM) ordered construction at Revolution Wind to stop, and a court allowed work to resume in September.[26]

    On 22 December 2025 the Interior Department paused leases for five projects under construction: Revolution Wind, Sunrise Wind, Empire Wind, Vineyard Wind 1 and Coastal Virginia Offshore Wind. It cited national security concerns, including radar interference.[4] Between 12 January and 2 February 2026, judges in the District of Columbia, Virginia and Massachusetts granted all five projects preliminary injunctions while the lawsuits continued.[5] Revolution Wind, a 704 MW project, began sending power to New England on 14 March 2026.[27] Ørsted said all 65 turbines were installed by September and that it expected commercial operation later in 2026.[28]

    Other actions continued through 2026, as reported by the Harvard Environmental & Energy Law Program tracker. Starting with TotalEnergies in March, the Interior Department reached agreements under which leaseholders give up offshore wind leases in return for payments tied to investment in other energy projects, and a coalition of states has sued over the TotalEnergies deal.[29] On 30 September a court ruled Empire Wind’s challenge moot because the suspension order had expired.[30] In October the government asked courts to send back its approvals of three authorised projects, including Revolution Wind, for reconsideration.[31]

    Read next: how the grid absorbs variable wind output, how solar compares, and how storage helps balance both.

    Next in the crash course

    More in Energy and climate

    Developing in Science & Energy

    Go deeper

    Questions readers ask

    How does a wind turbine generate electricity?

    Wind flowing over the blades creates lift, like an aircraft wing, which turns them. The blades drive a shaft connected to a generator.[1]

    How big are wind turbines?

    They range from about 10 kW machines for a single home to the largest operating turbines of about 15 MW. Blade length is the biggest factor in how much a turbine can generate.[7]

    How often do wind turbines produce power?

    US wind farms averaged a capacity factor of 33.8% in 2025, meaning they produced about a third of their maximum possible output. Wind speeds vary through the day and by season.[11][9]

    Is offshore wind more expensive than onshore wind?

    Yes. IRENA estimates new onshore wind averaged USD 33 per MWh in 2025, against USD 78 per MWh for offshore wind.[14]

    What happened to US offshore wind projects in 2025 and 2026?

    The Interior Department paused five East Coast projects under construction on 22 December 2025, citing national security. Federal judges granted all five preliminary injunctions by early February 2026, allowing construction to resume while the lawsuits went on.[4][5]

    Which US states produce the most wind power?

    Texas, Iowa, Oklahoma, Kansas and Illinois, which together produced about 52% of US wind generation in 2025.[18]

    Sources

    · 31 claims from 12 publishers

    Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.

    1. [1]

      Wind flowing over a turbine's blades creates lift that turns them; the blades drive a shaft connected to an electric generator. confirmedas of 2026-11-07

    2. [2]

      US wind generation grew from about 6 billion kWh in 2000 to about 464 billion kWh in 2025, about 10.5% of utility-scale electricity. confirmedas of 2026-11-07

    3. [3]

      IRENA counted record wind additions of 158.7 GW worldwide in 2025, 14% growth, with China adding 119.4 GW. confirmedas of 2026-04-01

    4. [4]

      On 22 December 2025 the Interior Department paused leases for five large offshore wind projects under construction off the East Coast, Revolution Wind, Sunrise Wind, Empire Wind, Vineyard Wind 1 and Coastal Virginia Offshore Wind, citing national security concerns including radar interference. confirmedas of 2026-11-07

    5. [5]

      Between 12 January and 2 February 2026, federal judges in the District of Columbia, Virginia and Massachusetts granted preliminary injunctions to all five projects, allowing construction to resume while the lawsuits continued. confirmedas of 2026-11-07

    6. [6]

      Nearly all operating wind turbines are horizontal-axis designs, commonly with three propeller-like blades. confirmedas of 2026-11-07

    7. [7]

      Wind turbines range from about 10 kW machines that can power a single home to the largest operating turbines of about 15 MW, and blade length is the biggest factor in how much electricity a turbine can generate. confirmedas of 2026-11-07

    8. [8]

      The EIA says good sites for utility-scale wind turbines have annual average wind speeds of at least 13 mph (5.8 m/s), and that wind speeds generally increase with height above the ground. confirmedas of 2026-11-07

    9. [9]

      Wind speeds change through the day and from season to season; in some places, such as California and Montana, the seasonal pattern matches local electricity demand. confirmedas of 2026-11-07

    10. [10]

      A generator's capacity is its maximum output, while its capacity factor is the ratio of what it actually produced over a period to the most it could have produced. confirmedas of 2026-11-07

    11. [11]

      In 2025, US utility-scale solar photovoltaic plants had an average capacity factor of 24.0%, wind 33.8% and nuclear 91.1%, according to EIA data. confirmedas of 2026-11-07

    12. [12]

      To keep the grid stable, the amount of electricity supplied must match demand at all times; if they fall out of balance, local or widespread blackouts can happen. confirmedas of 2026-11-07

    13. [13]

      The IEA says curtailment and negative prices signal a lack of flexibility, and that demand-side flexibility, storage and dispatchable power plants will increasingly be needed to integrate wind and solar. confirmedas of 2025-10-07

    14. [14]

      IRENA estimates that the average cost of electricity from new solar PV stayed at USD 44 per MWh in 2025, while onshore wind fell 4% to USD 33/MWh and offshore wind fell 3% to USD 78/MWh. confirmedas of 2026-07-02

    15. [15]

      The IEA expects global wind capacity to nearly double to over 2,000 GW by 2030 despite supply chain issues, rising costs and permitting delays. confirmedas of 2025-10-07· forecast

    16. [16]

      The IEA expects supply chain concentration in key solar PV production segments to remain above 90% in 2030, and says China dominates the mining (60%) and refining (90%) of rare earths used in wind turbine magnets. confirmedas of 2025-10-07· forecast

    17. [17]

      Wind accounted for 43% of US utility-scale renewable generation in 2025, the largest share of any renewable source. confirmedas of 2026-11-07

    18. [18]

      Wind projects in 43 US states generated electricity in 2025, and the top five states, Texas, Iowa, Oklahoma, Kansas and Illinois, produced about 52% of the total. confirmedas of 2026-11-07

    19. [19]

      US developers planned 11.8 GW of wind capacity for 2026, more than double the 2025 total but below the more than 14 GW added in each of 2020 and 2021; the 3,650 MW SunZia project in New Mexico was expected to start operating in 2026. confirmedas of 2026-02-20

    20. [20]

      European countries and China lead the world in offshore wind capacity. confirmedas of 2026-11-07

    21. [21]

      The US Department of Energy estimates the technical offshore wind resource in US federal waters and the Great Lakes at more than 4,000 GW, though not all of it would realistically be developed. confirmedas of 2026-11-07

    22. [22]

      At the end of 2024 the US had two operating offshore wind projects, South Fork (130 MW) off New York and Vineyard Wind 1 (174 MW operating at the time). confirmedas of 2026-11-07

    23. [23]

      The IEA cut its five-year offshore wind growth forecast by more than 25%, citing the US policy shift and project cancellations and delays in Europe, Japan and India. confirmedas of 2025-10-07

    24. [24]

      On 20 January 2025 a presidential memorandum withdrew offshore areas from wind leasing, ordered a review of existing leases and told agencies not to issue new or renewed approvals for onshore or offshore wind projects; on 8 December 2025 the US District Court for the District of Massachusetts granted summary judgment to a coalition of states led by New York and vacated the resulting pause in wind authorizations, holding that it violated the Administrative Procedure Act. confirmedas of 2026-11-14

    25. [25]

      The New York Attorney General's office said on 15 June 2026 that the federal government had dismissed its appeal of the December 2025 ruling on the wind permitting pause. confirmedas of 2026-06-15

    26. [26]

      BOEM issued a stop-work order covering offshore construction at Revolution Wind on 22 August 2025, and a federal court granted a preliminary injunction on 22 September 2025 that allowed work to resume. confirmedas of 2026-11-07

    27. [27]

      Revolution Wind, a 704 MW project jointly owned by Ørsted and Skyborn Renewables, began delivering power to the New England grid on 14 March 2026. confirmedas of 2026-11-07

    28. [28]

      All 65 turbines at Revolution Wind had been installed by September 2026, with commissioning continuing and commercial operation expected later in 2026, according to Ørsted. reportedas of 2026-09-18

    29. [29]

      In 2026 the Interior Department reached agreements under which offshore wind leaseholders give up their leases in exchange for government payments tied to investment in other energy projects, starting with a 23 March deal with TotalEnergies refunding $928 million in lease fees; a coalition of states has sued over the TotalEnergies agreement. reportedas of 2026-11-07

    30. [30]

      On 30 September 2026 a federal court ruled Empire Wind's challenge to the December 2025 suspension moot because the order had expired by its terms, according to the Harvard Environmental & Energy Law Program tracker. reportedas of 2026-11-07

    31. [31]

      In October 2026 the federal government asked courts to send back for reconsideration its approvals of three authorised offshore wind projects, including Revolution Wind, according to the Harvard tracker. reportedas of 2026-11-07

    Revision history (3)
    1. Attributed the December 2025 court ruling on the wind permitting pause to Harvard's Environmental & Energy Law Program, its only source.
    2. Added the New York Attorney General's releases on the December 2025 ruling and the June 2026 dismissal of the government's appeal.
    3. Page created.

    Created Nov 7, 2026. Last reviewed by an editor on Nov 8, 2026. Next scheduled review: Feb 7, 2027.

    Cite this page

    "How wind power works." ContentLora, updated Nov 14, 2026. https://contentlora.com/explain/how-wind-power-works

    Spotted an error? Suggest a correction or emailcorrections@contentlora.com.