    Palisades nuclear plant

    Also known as Palisades Nuclear Power Plant, Palisades Nuclear Plant, Holtec Palisades

    Palisades is an 800 MW nuclear plant in Covert Township, Michigan, that ceased operations in May 2022.[1] Its owner, Holtec, is restarting it with a $1.52 billion DOE loan, and DOE says it will be the first restart of a retired nuclear plant in US history.[2][3] Fuel loading began on 30 August 2026 but paused after one fuel assembly tilted; Holtec recovered the assembly in October.[4][5][6] As of 29 October 2026 the plant had not restarted, and Holtec said it still had to finish fuel loading, testing and inspections and meet all NRC requirements.[7]

    Editor reviewedUpdated Wiki14 claims · 86% primaryEnergy and climate
    Key facts

    Palisades is an 800 MW nuclear power plant in Covert Township, Michigan.[1] It ceased operations in May 2022, and its owner, Holtec International, is working to bring it back into service.[1][2] DOE says that once complete, the project will be the first restart of a retired nuclear power plant in US history.[3]

    This page describes the plant and the restart as stated by its owner, DOE and NRC notices in the Federal Register, as of 14 November 2026. The restart has not been completed, and dates the owner gives are its own plans.

    From shutdown to restart plan

    The World Nuclear Association notes that Entergy announced in 2017 it would keep Palisades open until 2022, and that the plant was then sold to Holtec for decommissioning.[8] The plant ceased operations in May 2022.[1]

    In September 2024 DOE closed a $1.52 billion loan to Holtec Palisades to help finance the restoration and restart. DOE says the upgraded plant is to produce power until at least 2051, subject to NRC licensing approvals.[2] Holtec says the restart will restore about 805 MW of electricity and is underpinned by long-term power purchase agreements with Wolverine Power Cooperative and Hoosier Energy, alongside the DOE loan and State of Michigan funding.[9]

    Licensing and repairs

    Holtec says the NRC approved its licensing package to reauthorise power operations on 24 July 2025. On 25 August 2025, according to Holtec, the plant formally moved from decommissioning to operations status under NRC oversight, the first US nuclear plant to do so.[10]

    Holtec lists the main repair work as reinforcing tubes in the plant’s two steam generators, replacing the control rod drive mechanism nozzles, chemically decontaminating the primary system and inspecting the reactor vessel.[11]

    Fuel loading and the tilted assembly

    Palisades began loading fuel into its reactor vessel on 30 August 2026. Holtec says the core holds 204 fuel assemblies, a mix of new fuel and partly used fuel from earlier operating cycles.[4]

    During loading, one fuel assembly tilted from its upright position after it had been placed. Holtec notified the NRC, said the event did not trigger NRC safety reporting requirements, paused fuel loading and began a root cause evaluation.[5] Separately, the plant was reconnected to its 345-kV switchyard on 11 September 2026, the route its power will take to the transmission grid.[12]

    On 13 October 2026 the NRC issued a one-time license amendment under exigent circumstances, allowing the assembly, designated DD41, to be moved from the reactor to the spent fuel pool using different equipment and a different path from those described in the plant’s safety analysis report.[13] Holtec said on 21 October that it had recovered the assembly with a purpose-built device and moved it to the spent fuel pool.[6]

    Where the restart stands

    As of 29 October 2026 the plant had not resumed operation. Holtec said remaining steps included completing fuel loading, required testing, inspections and operational readiness activities, and that Palisades would resume operations only when all work is complete and all applicable NRC requirements are met.[7]

    New reactors planned at the site

    Holtec plans two SMR-300 small modular reactors at Palisades and submitted a partial construction permit application for them to the NRC in December 2025, according to the World Nuclear Association.[14] Another restart of a shut US reactor, at Three Mile Island in Pennsylvania, is covered on crane-clean-energy-center.

    More in Energy and climate

    Questions readers ask

    Has the Palisades nuclear plant restarted?

    Not as of 29 October 2026. Holtec said the remaining steps included completing fuel loading, required testing, inspections and operational readiness work, and that the plant would resume operations only when all of that is done and all applicable NRC requirements are met.[7]

    Why did Palisades close?

    The plant ceased operations in May 2022. The World Nuclear Association notes that Entergy had said in 2017 it would keep the plant open until 2022, and that the plant was sold to Holtec for decommissioning.[1][8]

    Who is paying for the restart?

    DOE closed a $1.52 billion loan to Holtec Palisades in September 2024. Holtec also cites funding from the State of Michigan and long-term power purchase agreements with Wolverine Power Cooperative and Hoosier Energy.[2][9]

    What happened during fuel loading?

    Fuel loading began on 30 August 2026. One fuel assembly then tilted after it had been placed, and fuel loading paused. The NRC approved a one-time license amendment on 13 October 2026 for a different way of moving the assembly, and Holtec said on 21 October that it had recovered the assembly and moved it to the spent fuel pool.[4][5][13][6]

    Is Palisades really the first US reactor restart?

    DOE says that once complete, the project will be the first restart of a retired nuclear power plant in US history. Holtec says that in August 2025 it became the first US plant to move from decommissioning back to operations status under NRC oversight.[3][10]

    Are new reactors planned at Palisades?

    Holtec plans two SMR-300 small modular reactors at the site and submitted a partial construction permit application to the NRC in December 2025, according to the World Nuclear Association.[14]

    Sources

    · 14 claims from 4 publishers

    Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.

    1. [1]

      Palisades is an 800 MW nuclear power plant in Covert Township, Michigan, that ceased operations in May 2022. confirmedas of 2026-11-14

      • EDF Project: Palisades · US Department of Energy, Office of Energy Dominance Financing · Primary source · Project summary (retrieved 2026-11-14)
      • EDF Project: Palisades · US Department of Energy, Office of Energy Dominance Financing · Primary source · Project summary (retrieved 2026-11-14)
    2. [2]

      In September 2024 the US Department of Energy closed a $1.52 billion loan to Holtec Palisades to help finance the plant's restoration and restart; DOE says the plant is to produce power until at least 2051, subject to NRC licensing approvals. confirmedas of 2026-11-14

      • EDF Project: Palisades · US Department of Energy, Office of Energy Dominance Financing · Primary source · Project summary (retrieved 2026-11-14)
      • EDF Project: Palisades · US Department of Energy, Office of Energy Dominance Financing · Primary source · Project summary (retrieved 2026-11-14)
    3. [3]

      DOE says that once complete, the Palisades project will be the first restart of a retired nuclear power plant in US history. confirmedas of 2026-11-14

      • EDF Project: Palisades · US Department of Energy, Office of Energy Dominance Financing · Primary source · Project summary (retrieved 2026-11-14)
    4. [4]

      Palisades began loading fuel into its reactor vessel on 30 August 2026, entering Mode 6 (refuelling); Holtec says the core holds 204 fuel assemblies, a mix of new and partly used fuel. confirmedas of 2026-08-30

    5. [5]

      During fuel loading, one fuel assembly tilted from its upright position after it had been placed; Holtec notified the NRC, said the event did not trigger NRC safety reporting requirements, paused fuel loading and began a root cause evaluation. confirmedas of 2026-10-13

    6. [6]

      Holtec said on 21 October 2026 that it had recovered the tilted fuel assembly with a purpose-built device and moved it in a transfer canister to the spent fuel pool, after the NRC approved its license amendment request. confirmedas of 2026-10-21

    7. [7]

      As of 29 October 2026 Palisades had not resumed operation; Holtec said remaining steps included completing fuel loading, required testing, inspections and operational readiness activities, and that the plant would restart when all work is complete and all applicable NRC requirements are met. confirmedas of 2026-10-29

    8. [8]

      Entergy had said in 2017 it would keep Palisades open until 2022, and the plant was sold to Holtec for decommissioning, according to the World Nuclear Association. reportedas of 2026-11-04

    9. [9]

      Holtec says the restart will restore about 805 MW of electricity and is backed by long-term power purchase agreements with Wolverine Power Cooperative and Hoosier Energy, as well as the DOE loan and funding from the State of Michigan. confirmedas of 2026-10-29

    10. [10]

      Holtec says the NRC approved its licensing package to reauthorise power operations on 24 July 2025, and that on 25 August 2025 Palisades formally moved from decommissioning to operations status, the first US nuclear plant to do so. confirmedas of 2025-08-25

    11. [11]

      Holtec says the restart work included reinforcing tubes in the plant's two steam generators, replacing the control rod drive mechanism nozzles, chemically decontaminating the primary system and inspecting the reactor vessel. confirmedas of 2026-08-30

    12. [12]

      On 11 September 2026 Palisades was reconnected to its 345-kV switchyard, which will carry the plant's electricity to the transmission grid, according to Holtec. confirmedas of 2026-09-11

    13. [13]

      On 13 October 2026 the NRC issued a one-time license amendment under exigent circumstances allowing Palisades to move fuel assembly DD41 from the reactor to the spent fuel pool using different equipment and a different path from those in its safety analysis report. confirmedas of 2026-10-22

    14. [14]

      Holtec plans to build two SMR-300 small modular reactors at the Palisades site and submitted a partial construction permit application for them to the NRC in December 2025, according to the World Nuclear Association. reportedas of 2026-11-04

    Revision history (1)
    1. Page created.

    Created Nov 14, 2026. Last reviewed by an editor on Nov 15, 2026. Next scheduled review: Jan 14, 2027.