Skip to content
ContentLora

    Tip: press / anywhere to search.

    Explainer

    Offshore wind explained: fixed and floating turbines, costs, markets

    Offshore wind farms put turbines at sea, where DOE describes the wind resource as abundant, strong and consistent and close to coastal population centres.[1] The Global Wind Energy Council counts 92.5 GW installed worldwide at the end of 2025, with China, the UK, Germany, the Netherlands and Taiwan holding about 90% of it.[2][3] Offshore power costs more than onshore wind: IRENA puts new offshore projects at about USD 78 per MWh in 2025, against USD 33 for onshore.[4] DOE says about two-thirds of US offshore wind potential is in water too deep for fixed foundations and would need floating turbines.[5] In the US, the Interior Department paused leases for five projects under construction in December 2025, and court injunctions in early 2026 let all five resume construction.[6][7]

    Editor reviewedUpdated Explainer23 claims · 57% primaryEnergy and climate

    Offshore wind uses the same basic machine as onshore wind, a turbine whose blades drive a generator, but places it at sea.[8][1] This page covers why developers go offshore, how fixed and floating designs differ, where the industry is growing, what it costs, and the policy and court fights in the UK and US as of November 2026. For how turbines work and how onshore and offshore wind compare, see How wind power works.

    Why build at sea

    The US Department of Energy (DOE) describes offshore wind resources as abundant, strong and consistent, and located near coastal, high-density population centres.[1] DOE puts the technical resource in US federal waters and the Great Lakes at more than 4,000 GW, though not all of it could realistically be developed.[9]

    The Global Wind Energy Council (GWEC), an industry body, says the average offshore turbine installed in 2025 was 10.3 MW, the first year above 10 MW.[10]

    Fixed-bottom and floating turbines

    Fixed-bottom turbines stand on foundations secured directly to the sea floor. DOE says about two-thirds of US offshore wind potential lies over water too deep for those foundations and would instead need floating platforms.[5] DOE’s Floating Offshore Wind Shot, an initiative run with the Interior, Commerce and Transportation departments, aims to cut the cost of floating offshore wind by more than 70%, to $45 per megawatt-hour by 2035, for deep-water sites far from shore.[11]

    The UK government says the UK has the world’s largest pipeline of floating offshore wind projects with confirmed seabed rights, including around 25 GW in development in Scotland.[12]

    Global capacity and leading markets

    GWEC reports that 9.3 GW of new offshore wind was connected to grids worldwide in 2025, the third-highest year on record. China commissioned 6.6 GW, leading for the eighth year running, while Europe commissioned nearly 2 GW.[13] That brought the global total to 92.5 GW at the end of 2025, or 7.1% of all wind capacity, spread across 19 markets.[2] China, the UK, Germany, the Netherlands and Taiwan held 90.3% of it.[3]

    Growth has slowed from earlier expectations. GWEC says inflation, rising interest rates, supply chain constraints and policy uncertainty have slowed deployment.[14] The International Energy Agency cut its five-year offshore wind growth forecast by more than 25%, citing the US policy shift and cancellations and delays in Europe, Japan and India.[15]

    Costs

    On average, offshore wind costs more than onshore wind. IRENA estimates the average cost of electricity from new offshore wind fell 3% to USD 78 per MWh in 2025, compared with USD 33 per MWh for onshore wind.[4] For how generation costs feed into household bills, see Electricity prices explained.

    The UK: auctions and the 2030 target

    The UK’s Clean Power 2030 Action Plan said that around 31 GW of offshore wind was built or contracted and that this would need to rise to 43-50 GW in 2030.[16] The plan noted that the fifth Contracts for Difference allocation round (AR5) secured no offshore wind, while the sixth round (AR6) supported over 5 GW.[17]

    The United States: projects and court fights

    At the end of 2024 the US had two operating offshore wind projects: South Fork (130 MW) off New York and Vineyard Wind 1, with 174 MW then operating.[18] As of May 2026, developers reported plans for about 5,089 MW of offshore wind off New York, Rhode Island and Virginia.[19] Revolution Wind, a 704 MW project, began delivering power to the New England grid on 14 March 2026.[20]

    Federal policy changed in 2025. A presidential memorandum on 20 January 2025 withdrew offshore areas from wind leasing and paused approvals; on 8 December 2025 a federal court in Massachusetts vacated that pause, ruling that it violated the Administrative Procedure Act.[21] On 22 December 2025 the Interior Department paused leases for five projects under construction, Revolution Wind, Sunrise Wind, Empire Wind, Vineyard Wind 1 and Coastal Virginia Offshore Wind, citing national security concerns including radar interference.[6] Between 12 January and 2 February 2026, federal judges granted all five projects preliminary injunctions, allowing construction to resume while the lawsuits continue.[7]

    In 2026 the Interior Department also reached agreements under which some leaseholders give up offshore wind leases in return for payments tied to other energy investment, starting with TotalEnergies in March; a coalition of states has sued over that deal.[22] In October 2026 the federal government asked courts to send back its approvals of three authorised projects, including Revolution Wind, for reconsideration.[23] The court history is covered in more detail in How wind power works.

    US Department of Energy (DOE)

    The US Department of Energy runs 17 national labs, the nuclear weapons stockpile, energy loans and the Genesis AI mission. Its role and FY 2027 budget.

    More in Energy and climate

    Developing in Science & Energy

    Go deeper

    Questions readers ask

    Why build wind farms at sea?

    The US Department of Energy describes offshore wind resources as abundant, strong and consistent, and located near coastal, high-density population centres. It estimates the technical resource in US federal waters and the Great Lakes at more than 4,000 GW, though not all of it could realistically be developed.[1][9]

    What is the difference between fixed-bottom and floating offshore wind?

    Fixed-bottom turbines sit on foundations secured directly to the sea floor. DOE says about two-thirds of US offshore wind potential lies over water too deep for those foundations and would need floating platforms. DOE's Floating Offshore Wind Shot aims to cut floating wind costs by more than 70%, to $45 per MWh by 2035.[5][11]

    How much offshore wind is there worldwide?

    The Global Wind Energy Council counts 92.5 GW at the end of 2025, 7.1% of all wind capacity, after 9.3 GW was connected that year. China commissioned 6.6 GW in 2025 and Europe nearly 2 GW.[2][13]

    Is offshore wind more expensive than onshore wind?

    On average, yes. IRENA estimates new offshore wind averaged USD 78 per MWh in 2025, down 3%, compared with USD 33 per MWh for onshore wind.[4]

    How much offshore wind does the UK plan?

    The UK's Clean Power 2030 Action Plan said around 31 GW of offshore wind was built or contracted and that this would need to rise to 43-50 GW in 2030.[16]

    What happened to US offshore wind in 2025 and 2026?

    A January 2025 presidential memorandum withdrew offshore areas from wind leasing and paused approvals; a federal court vacated the pause in December 2025. In December 2025 the Interior Department paused leases for five projects under construction, citing national security, and courts granted all five preliminary injunctions between January and February 2026.[21][6][7]

    Sources

    · 23 claims from 13 publishers

    Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.

    1. [1]

      The US Department of Energy describes offshore wind resources as abundant, strong and consistent, and located near coastal, high-density population centres. confirmedas of 2026-11-14

    2. [2]

      GWEC puts total global offshore wind capacity at 92.5 GW at the end of 2025, 7.1% of all wind capacity, in 19 markets. reportedas of 2026-11-14

    3. [3]

      According to GWEC, China, the United Kingdom, Germany, the Netherlands and Taiwan held 90.3% of the world's offshore wind capacity at the end of 2025. reportedas of 2026-11-14

    4. [4]

      IRENA estimates that the average cost of electricity from new solar PV stayed at USD 44 per MWh in 2025, while onshore wind fell 4% to USD 33/MWh and offshore wind fell 3% to USD 78/MWh. confirmedas of 2026-07-02

    5. [5]

      DOE says about two-thirds of US offshore wind potential lies over water too deep for fixed-bottom foundations secured to the sea floor and would need floating platforms. confirmedas of 2026-11-14

    6. [6]

      On 22 December 2025 the Interior Department paused leases for five large offshore wind projects under construction off the East Coast, Revolution Wind, Sunrise Wind, Empire Wind, Vineyard Wind 1 and Coastal Virginia Offshore Wind, citing national security concerns including radar interference. confirmedas of 2026-11-07

    7. [7]

      Between 12 January and 2 February 2026, federal judges in the District of Columbia, Virginia and Massachusetts granted preliminary injunctions to all five projects, allowing construction to resume while the lawsuits continued. confirmedas of 2026-11-07

    8. [8]

      Wind flowing over a turbine's blades creates lift that turns them; the blades drive a shaft connected to an electric generator. confirmedas of 2026-11-07

    9. [9]

      The US Department of Energy estimates the technical offshore wind resource in US federal waters and the Great Lakes at more than 4,000 GW, though not all of it would realistically be developed. confirmedas of 2026-11-07

    10. [10]

      GWEC says the average offshore turbine installed in 2025 was 10.3 MW, the first year above 10 MW. reportedas of 2026-11-14

    11. [11]

      DOE's Floating Offshore Wind Shot, led by the Departments of Energy, Interior, Commerce and Transportation, aims to cut the cost of floating offshore wind by more than 70%, to $45 per megawatt-hour by 2035 for deep-water sites far from shore. confirmedas of 2026-11-14

    12. [12]

      The UK government says the UK has the world's largest pipeline of floating offshore wind projects with confirmed seabed rights, including around 25 GW in development in Scotland. confirmedas of 2026-11-14

    13. [13]

      The Global Wind Energy Council reports that 9.3 GW of new offshore wind was grid-connected worldwide in 2025, the third-highest year on record, with China commissioning 6.6 GW and Europe nearly 2 GW. reportedas of 2026-11-14

    14. [14]

      GWEC says inflation, rising interest rates, supply chain constraints and policy uncertainty have slowed offshore wind deployment. reportedas of 2026-11-14

    15. [15]

      The IEA cut its five-year offshore wind growth forecast by more than 25%, citing the US policy shift and project cancellations and delays in Europe, Japan and India. confirmedas of 2025-10-07

    16. [16]

      The UK's Clean Power 2030 Action Plan said about 31 GW of offshore wind was built or contracted and that this would need to rise to 43-50 GW in 2030. confirmedas of 2026-11-14

    17. [17]

      The plan noted that the UK's fifth Contracts for Difference allocation round (AR5) secured no offshore wind, while the sixth (AR6) supported over 5 GW. confirmedas of 2026-11-14

    18. [18]

      At the end of 2024 the US had two operating offshore wind projects, South Fork (130 MW) off New York and Vineyard Wind 1 (174 MW operating at the time). confirmedas of 2026-11-07

    19. [19]

      EIA says that as of May 2026, developers reported plans for about 5,089 MW of offshore wind capacity off New York, Rhode Island and Virginia. confirmedas of 2026-11-14

    20. [20]

      Revolution Wind, a 704 MW project jointly owned by Ørsted and Skyborn Renewables, began delivering power to the New England grid on 14 March 2026. confirmedas of 2026-11-07

    21. [21]

      On 20 January 2025 a presidential memorandum withdrew offshore areas from wind leasing, ordered a review of existing leases and told agencies not to issue new or renewed approvals for onshore or offshore wind projects; on 8 December 2025 the US District Court for the District of Massachusetts granted summary judgment to a coalition of states led by New York and vacated the resulting pause in wind authorizations, holding that it violated the Administrative Procedure Act. confirmedas of 2026-11-14

    22. [22]

      In 2026 the Interior Department reached agreements under which offshore wind leaseholders give up their leases in exchange for government payments tied to investment in other energy projects, starting with a 23 March deal with TotalEnergies refunding $928 million in lease fees; a coalition of states has sued over the TotalEnergies agreement. reportedas of 2026-11-07

    23. [23]

      In October 2026 the federal government asked courts to send back for reconsideration its approvals of three authorised offshore wind projects, including Revolution Wind, according to the Harvard tracker. reportedas of 2026-11-07

    Revision history (1)
    1. Page created.

    Created Nov 14, 2026. Last reviewed by an editor on Nov 14, 2026. Next scheduled review: Feb 14, 2027.

    Cite this page

    "Offshore wind explained: fixed and floating turbines, costs, markets." ContentLora, updated Nov 14, 2026. https://contentlora.com/explain/offshore-wind-explained

    Spotted an error? Suggest a correction or emailcorrections@contentlora.com.