Skip to content
ContentLora

    Tip: press / anywhere to search.

    Explainer

    The 2025 law's clean energy tax credit phase-outs

    The July 2025 tax law, Public Law 119-21, ended or cut back many clean energy tax credits.[1] Credits for new, used and commercial electric vehicles stopped for vehicles acquired after 30 September 2025, and the home improvement and residential clean energy credits ended after 31 December 2025.[2][3] Wind and solar projects lose the main electricity credits if placed in service after 31 December 2027, unless construction began by 4 July 2026.[4]

    Editor reviewedUpdated Explainer15 claims · 93% primaryEnergy and climate, Electric and self-driving vehicles
    Reading level: 1 passage differs; the rest is the same for everyone.

    This page explains public policy. It is not tax, legal or financial advice, and it does not recommend any purchase or investment. Tax rules depend on your circumstances: check the IRS or a qualified tax professional before filing.

    Public Law 119-21, signed on 4 July 2025 and commonly called the One, Big, Beautiful Bill Act, rewrote many federal clean energy tax credits.[1] Some credits ended within months. Others got later end dates or new conditions.[2][4] A separate page explains the foreign entity of concern rules that also apply to several of these credits.

    Credits for households and vehicles

    The consumer credits ended first. The IRS says the new clean vehicle credit (30D), the used clean vehicle credit (25E) and the commercial clean vehicle credit (45W) are not allowed for vehicles acquired after 30 September 2025.[2] Our EV tax credits and tariffs explainer covers the vehicle credit in more detail.

    Home credits followed at the end of 2025. The energy efficient home improvement credit (25C) is not allowed for property placed in service after 31 December 2025. The residential clean energy credit (25D) is not allowed for expenditures made after that date.[3]

    Two more credits ended in mid-2026. The law moved the end date of the new energy efficient home credit (45L) and the credit for alternative fuel vehicle refuelling property (30C) from 31 December 2032 to 30 June 2026.[5]

    Wind and solar: the 2026 and 2027 dates

    The clean electricity production credit (45Y) and investment credit (48E) no longer apply to wind and solar facilities placed in service after 31 December 2027. That cut-off applies only to facilities whose construction began after 4 July 2026, 12 months after the law was enacted.[4] A project that started construction by that date can still qualify if it meets the continuity rules below.[4][6]

    Treasury and the IRS set out what counts as starting construction in Notice 2025-42. The notice says it was issued consistent with Executive Order 14315 of 7 July 2025, Ending Market Distorting Subsidies for Unreliable, Foreign-Controlled Energy Sources.[7]

    “Beginning construction” is a tax test, not the day a project opens. It turns on when significant physical work started, and the project then has a few years to be finished and placed in service.[8][6]

    The notice makes the Physical Work Test the sole method for most wind and solar projects. It asks for physical work of a significant nature and sets no fixed minimum amount or cost.[8] A five percent cost safe harbor remains only for solar facilities with a maximum net output of 1.5 MW or less.[9] A facility placed in service by the end of the fourth calendar year after construction began is treated as meeting the continuity requirement.[6] The notice applies to facilities whose construction had not begun before 2 September 2025.[10]

    Other electricity sources and fuels

    The early cut-off covers wind and solar. For other zero-emission electricity facilities, the law fixes calendar year 2032 as the “applicable year” that starts the 45Y phase-down.[11]

    Hydrogen producers face an earlier deadline. The law moved the deadline to begin construction for the 45V clean hydrogen credit from 1 January 2033 to 1 January 2028.[12] The 45Z clean fuel production credit went the other way: the IRS says it was extended to fuel sold before 1 January 2030.[13]

    Manufacturing credits

    The law ends the advanced manufacturing production credit (45X) for wind energy components produced and sold after 31 December 2027.[14] The credit for critical minerals phases down to 75% in 2031, 50% in 2032 and 25% in 2033, and it falls to zero after 2033.[14]

    Sourcing rules on top of the dates

    The end dates are not the only change. From 2026, projects claiming 45Y or 48E, and manufacturers claiming 45X, must also limit “material assistance” from prohibited foreign entities.[15] Those rules have their own explainer, on foreign entity of concern rules.

    This page covers the federal credits named above. It does not cover state incentives or every federal credit the law changed.

    More in Energy and climate

    Developing in Science & Energy

    Go deeper

    Questions readers ask

    Can I still claim the federal EV tax credit?

    The IRS says the new, used and commercial clean vehicle credits are not allowed for vehicles acquired after 30 September 2025.[2]

    Do the home energy credits still apply?

    The IRS says the energy efficient home improvement credit is not allowed for property placed in service after 31 December 2025, and the residential clean energy credit is not allowed for expenditures made after that date.[3]

    What is the deadline for wind and solar projects?

    Wind and solar facilities placed in service after 31 December 2027 lose the 45Y production and 48E investment credits, unless their construction began by 4 July 2026.[4]

    How does a wind or solar project show construction began?

    Under Notice 2025-42, mainly through the Physical Work Test, meaning physical work of a significant nature. A five percent cost safe harbor survives only for solar facilities of 1.5 MW or less.[8][9]

    Did the law end every clean energy credit?

    No. For other zero-emission electricity sources, it set calendar year 2032 as the year that starts the 45Y phase-down, and it extended the 45Z clean fuel credit to fuel sold before 2030.[11][13]

    What happened to the manufacturing credit?

    The 45X credit no longer applies to wind components produced and sold after 2027, and the critical minerals credit phases down from 2031 to zero after 2033.[14]

    Sources

    · 15 claims from 5 publishers

    Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.

    1. [1]

      The phase-outs come from Public Law 119-21 of 4 July 2025, commonly known as the One, Big, Beautiful Bill Act (OBBBA). confirmedas of 2025-07-04

    2. [2]

      The IRS says the new clean vehicle credit (30D), the used clean vehicle credit (25E) and the commercial clean vehicle credit (45W) are not allowed for vehicles acquired after 30 September 2025. confirmedas of 2026-11-07

    3. [3]

      The IRS says the energy efficient home improvement credit (25C) is not allowed for property placed in service after 31 December 2025, and the residential clean energy credit (25D) is not allowed for expenditures made after that date. confirmedas of 2026-11-07

    4. [4]

      The law ends the clean electricity production (45Y) and investment (48E) credits for wind and solar facilities placed in service after 31 December 2027, unless their construction began by 4 July 2026, 12 months after enactment. confirmedas of 2025-08-15

    5. [5]

      The law moved the end date of the new energy efficient home credit (45L) and the alternative fuel vehicle refuelling property credit (30C) from 31 December 2032 to 30 June 2026. confirmedas of 2025-07-04

    6. [6]

      Under Notice 2025-42, a wind or solar facility placed in service by the end of the fourth calendar year after the year construction began is treated as meeting the continuous-construction requirement. confirmedas of 2025-08-15

    7. [7]

      Treasury and the IRS issued Notice 2025-42 on beginning of construction for wind and solar facilities consistent with Executive Order 14315 of 7 July 2025, titled Ending Market Distorting Subsidies for Unreliable, Foreign-Controlled Energy Sources. confirmedas of 2025-08-15

    8. [8]

      Under Notice 2025-42, wind and solar developers must show construction began through the Physical Work Test, meaning physical work of a significant nature, which has no fixed minimum amount or cost; it is the sole method except for small solar facilities. confirmedas of 2025-08-15

    9. [9]

      Notice 2025-42 keeps a five percent safe harbor only for low-output solar facilities with a maximum net output of no more than 1.5 MW. confirmedas of 2025-08-15

    10. [10]

      Notice 2025-42 applies to wind and solar facilities whose construction had not begun before 2 September 2025. confirmedas of 2025-08-15

    11. [11]

      For other zero-emission electricity facilities, the law fixes the "applicable year" that starts the 45Y phase-down as calendar year 2032. confirmedas of 2025-07-04

    12. [12]

      The One Big Beautiful Bill Act of July 2025 moved the 45V construction-start deadline from 1 January 2033 to 1 January 2028. confirmedas of 2025-07-30

    13. [13]

      The IRS says the 45Z clean fuel production credit was extended to fuel sold before 1 January 2030. confirmedas of 2026-11-07

    14. [14]

      The advanced manufacturing production credit (45X) no longer applies to wind energy components produced and sold after 31 December 2027, and the credit for critical minerals phases down to 75% in 2031, 50% in 2032, 25% in 2033 and 0% after 2033. confirmedas of 2025-07-04

    15. [15]

      Under the 2025 law, a facility whose construction begins after 31 December 2025 cannot qualify for the 45Y clean electricity production credit if its construction includes any material assistance from a prohibited foreign entity; parallel rules apply to the 48E investment credit and the 45X manufacturing credit. confirmedas of 2026-02-12

    Revision history (1)
    1. Page created.

    Created Nov 14, 2026. Last reviewed by an editor on Nov 15, 2026. Next scheduled review: Nov 14, 2027.

    Cite this page

    "The 2025 law's clean energy tax credit phase-outs." ContentLora, updated Nov 14, 2026. https://contentlora.com/explain/clean-energy-tax-credit-phaseouts

    Spotted an error? Suggest a correction or emailcorrections@contentlora.com.