Explainer
Internet and telecoms: a crash course
The internet is a network of networks: the Internet Protocol only tries to deliver each packet, and separately run networks tell each other which addresses they can reach using BGP.[1][2] It is coordinated by bodies such as ICANN, which coordinates the internet's unique identifiers, including names in the DNS root zone, and the ITU, which allocates radio spectrum and satellite orbits worldwide.[3][4] The ITU estimates that 6 billion people, 74% of the world's population, were online in 2025, but only 23% in low-income countries.[5][6]
This crash course is a reading order for the internet and telecoms section. It starts with how data moves across the internet and how names are looked up, follows the connection from undersea cables to fibre, Wi-Fi, mobile and satellite links, and ends with the bodies that govern spectrum and the rules that shape service in the United States. Most of the policy detail is about the US. Work through the course list in order, or jump to the part you need.
Start with packets and routing
The Internet Protocol (IP) does one thing: it tries to deliver a package of bits, called a datagram, from a source to a destination across interconnected networks. It has no mechanisms of its own for reliability, flow control or ordering.[1] TCP adds those on top, giving applications a reliable, in-order stream of bytes and resending lost packets. UDP sends messages with minimal machinery and no delivery guarantee, and QUIC, standardized in 2021, is a secure transport built on UDP.[7][8][9]
Addresses come in two versions. IPv4, deployed from 1 January 1983 and still the most common, uses 32-bit addresses, while IPv6 uses 128-bit ones.[10][11] IANA hands blocks of addresses to five Regional Internet Registries, which pass them on to providers and users.[12]
The internet is not one network. It is made of autonomous systems, each run under a single routing policy, which tell each other which addresses they can reach using the Border Gateway Protocol (BGP).[13][2] Many swap local traffic at internet exchange points, which the Internet Society says gives shorter and cheaper routes than sending it abroad.[14] The internet explainer walks through each layer.
Names: DNS, ICANN and IANA
People use names; networks use numbers. The Domain Name System organizes names as a tree, with name servers each holding part of it and resolvers fetching answers on a user’s behalf.[15][16][17] At the top, the root zone is served by 13 named authorities, and as of 7 November 2026 the root server system had 2,048 operational instances run by 12 independent operators.[18][19] DNSSEC lets resolvers check that answers are genuine but does not hide them, while DNS over TLS and DNS over HTTPS encrypt the queries themselves.[20][21] The DNS explainer covers the lookup step by step.
ICANN, a California nonprofit formed in 1998, coordinates names in the root zone and policy for registering names within generic top-level domains through a multistakeholder model.[22][3][23] The IANA functions, which keep the authoritative registries of domain names, IP addresses and protocol codes, left US government stewardship on 1 October 2016.[24][25] When ICANN published the applications for its 2026 round of new top-level domains on 7 October 2026, it reported 1,615, a count it says will be confirmed later.[26]
The physical network: cables and fibre
International traffic travels mostly under the sea: the ITU says submarine cables carry over 99% of international data exchange.[27] Roughly 200 faults happen each year, mostly from fishing and dragged anchors.[28][29] The undersea cables explainer covers repairs and security.
Closer to home, fibre broadband commonly uses a passive optical network: one optical line termination at the provider’s end feeds many customer units through a tree of passive splitters.[30] The ITU’s GPON standard runs at 2.4 Gbit/s downstream, and XGS-PON at 10 Gbit/s in both directions.[31][32] The fibre explainer explains reach, split ratios and FTTH versus fibre to the cabinet.
Wireless: Wi-Fi, 5G and the road to 6G
Wi-Fi is built on the IEEE 802.11 family of standards.[33] In the US, the FCC opened the 6 GHz band to unlicensed use in 2020, and Wi-Fi 7, certified from 2024, adds 320 MHz channels there along with multi-link operation.[34][35] The Wi-Fi explainer compares the generations.
Mobile networks are standardised by 3GPP, which unites seven standards organisations from Japan, the US, China, Europe, India and Korea.[36][37] 3GPP defines 5G as the system specified from its Release 15, frozen in 2018, and the ITU estimates 5G covered 55% of the world’s population in 2025 but only 4% in low-income countries.[38][39] For 6G, the ITU sets the calendar and 3GPP develops a candidate technology; candidate submissions are invited from February 2027 to February 2029.[40][41] Read the 5G explainer, then the mobile standards explainer.
Satellites
Geostationary satellites orbit about 35,786 km above the equator and appear fixed in the sky, while low-Earth-orbit satellites fly below 2,000 km and circle Earth in about 90 minutes, so communications satellites there usually work in constellations.[42][43] The difference shows in latency: the FCC barred geostationary systems from the low-latency tier of its 2020 rural broadband auction, while SpaceX reported a median Starlink latency of about 25 milliseconds as of 31 March 2026.[44][45] SpaceX reported 13.6 million Starlink consumer subscribers as of 30 September 2026.[46] The satellite internet explainer compares the orbits.
Who governs the airwaves
Radio spectrum is the range of frequencies used for wireless services, and bands are allocated to specific uses.[47] Internationally, the ITU, a UN agency founded in 1865, allocates spectrum and satellite orbits through its Radio Regulations treaty, revised at World Radiocommunication Conferences every three to four years.[48][4][49] Its 2026 Plenipotentiary Conference is scheduled for Doha from 9 to 27 November.[50]
In the United States the FCC manages non-federal spectrum and NTIA manages federal use.[51] The FCC, created by the Communications Act of 1934, has five commissioners, no more than three from one party.[52][53][54] It awards competing licences by auction. Its auction authority lapsed in March 2023 and was restored through September 2034 by a July 2025 law.[55][56][57] The 2021 C-band auction raised $81 billion, the most to date.[58] The spectrum auctions explainer covers how bidding works.
US rules: net neutrality, universal service and robocalls
Net neutrality rules stop broadband providers from blocking or slowing connections based on content or commercial deals.[59] The FCC adopted them in 2015, dropped them in 2018 and restored them in 2024. On 2 January 2025 the Sixth Circuit set the 2024 order aside, holding that broadband is an information service, and the FCC says the 2024 rules never took effect.[60][61][62][63][64] The net neutrality explainer traces the back-and-forth.
Universal service is paid for by carriers: since the Telecommunications Act of 1996, every carrier providing interstate telecommunications must contribute to the Universal Service Fund, which supports four programmes: Lifeline, High Cost, E-Rate for schools and libraries, and Rural Health Care.[65][66] The Supreme Court upheld the funding scheme 6-3 in June 2025.[67] Read the Universal Service Fund explainer, and the BEAD explainer for the separate $42.45 billion grant programme.[68]
Robocalls are restricted by the Telephone Consumer Protection Act, and the 2019 TRACED Act required the FCC to make voice providers adopt STIR/SHAKEN, under which the caller’s provider attaches encrypted identifying information that the receiving provider uses to verify the caller ID.[69][70][71] It works only on internet-protocol networks, so the caller information is lost when a call crosses a network that cannot carry it.[72] The FTC received over 2.6 million Do Not Call complaints in fiscal 2025.[73] The robocalls explainer explains what the rules can and cannot stop.
When access is cut
The UN human rights office defines internet shutdowns as deliberate disruptions by or for a government, from full blackouts to throttling and blocking of social media or messaging apps.[74][75] It has recommended that states refrain from shutdowns altogether.[76] The advocacy group Access Now counted at least 313 shutdowns in 52 countries in 2025, the most it has recorded.[77] The internet shutdowns explainer covers the methods, the official justifications and the law.
Read next
Starlink
Starlink is SpaceX's satellite internet network. Its satellite and subscriber counts, phone-to-satellite service, and concerns about astronomy and debris.
Questions readers ask
Who runs the internet?
No single body does. Separately run networks, called autonomous systems, exchange routes with each other using BGP. ICANN coordinates the internet's unique identifiers, such as domain names, and IANA keeps the public registries of names, IP addresses and protocol codes. ICANN says it does not control content on the internet.[13][2][3][24][78]
What does DNS do?
The Domain Name System turns names into the information computers need to reach them. Names form a tree, and name servers each hold part of it. Resolvers fetch answers on a user's behalf and cache them for as long as each record's time-to-live allows.[15][16][17][79]
Is satellite internet slower than fibre?
It depends on the orbit. Geostationary satellites sit about 35,786 km up, and the FCC barred them from the low-latency tier of its 2020 rural broadband auction. Low-Earth-orbit systems fly far lower; SpaceX reported a median Starlink latency of about 25 milliseconds as of 31 March 2026.[42][44][43][45]
Are the FCC's net neutrality rules in force?
No. The Sixth Circuit set aside the FCC's 2024 rules on 2 January 2025, holding that broadband is an information service, and the FCC says those rules never took effect.[63][64]
What is the charge for universal service on a phone bill?
Carriers that provide interstate telecommunications must pay into the Universal Service Fund, based on a contribution factor the FCC sets each quarter, and they may pass the cost on to customers. In June 2025 the Supreme Court upheld the scheme 6-3.[65][80][67]
Sources
· 81 claims from 28 publishers
Each numbered claim is a statement we checked against the sources listed with it. Tap a number in the text to see its sources in place.
- [1]
The Internet Protocol (IP) is limited to delivering a package of bits, called a datagram, from a source to a destination across interconnected networks; it has no mechanisms of its own for end-to-end reliability, flow control or sequencing. confirmedas of 1981-09-01
- RFC 791: Internet Protocol · IETF (RFC Editor) · Primary source · 1981-09-01 · Section 1.2, Scope (retrieved 2026-11-07)
- RFC 791: Internet Protocol · IETF (RFC Editor) · Primary source · 1981-09-01 · Section 1.2, Scope (retrieved 2026-11-07)
- [2]
The Border Gateway Protocol (BGP) is how networks exchange reachability information, including the list of autonomous systems a route passes through, which is enough to build a graph of how autonomous systems connect. confirmedas of 2006-01-01
- RFC 4271: A Border Gateway Protocol 4 (BGP-4) · IETF (RFC Editor) · Primary source · 2006-01-01 · Section 1 (retrieved 2026-11-07)
- RFC 4271: A Border Gateway Protocol 4 (BGP-4) · IETF (RFC Editor) · Primary source · 2006-01-01 · Section 1 (retrieved 2026-11-07)
- [3]
ICANN's bylaws define its mission as ensuring the stable and secure operation of the internet's unique identifier systems, including coordinating names in the DNS root zone and policy for second-level domain registrations in generic top-level domains. confirmedas of 2026-11-07
- Bylaws for Internet Corporation for Assigned Names and Numbers · ICANN · Primary source · Article 1, Section 1.1(a) (retrieved 2026-11-07)
- Bylaws for Internet Corporation for Assigned Names and Numbers · ICANN · Primary source · Article 1, Section 1.1(a)(i) (retrieved 2026-11-07)
- Bylaws for Internet Corporation for Assigned Names and Numbers · ICANN · Primary source · Article 1, Section 1.1(a)(i) (retrieved 2026-11-07)
- [4]
The ITU, the United Nations specialized agency for information and communication technologies, allocates global radio spectrum and satellite orbits, develops technical standards so networks and technologies interconnect, and works to improve access to digital technology in underserved communities. confirmedas of 2026-11-07
- About International Telecommunication Union (ITU) · ITU · Primary source · What we do (retrieved 2026-11-07)
- About International Telecommunication Union (ITU) · ITU · Primary source · Who we are (retrieved 2026-11-07)
- [5]
The ITU estimates that 74% of the world's population, about 6 billion people, were using the internet in 2025, up from 71% (5.8 billion) in 2024. confirmedas of 2025-10-15
- Facts and Figures 2025: Internet use · ITU · Primary source (retrieved 2026-11-07)
- [6]
By ITU estimates for 2025, 94% of people in high-income countries used the internet, against 23% in low-income countries and 36% in Africa. confirmedas of 2025-10-15
- Facts and Figures 2025: Internet use · ITU · Primary source · High-income countries (retrieved 2026-11-07)
- Facts and Figures 2025: Internet use · ITU · Primary source (retrieved 2026-11-07)
- Facts and Figures 2025: Internet use · ITU · Primary source (retrieved 2026-11-07)
- [7]
TCP gives applications a reliable, in-order stream of bytes, sending it as segments carried inside IP packets; it detects lost packets with sequence numbers and errors with checksums, and corrects them by retransmission. confirmedas of 2022-08-01
- RFC 9293: Transmission Control Protocol (TCP) · IETF (RFC Editor) · Primary source · 2022-08-01 · Section 2.2 (retrieved 2026-11-07)
- RFC 9293: Transmission Control Protocol (TCP) · IETF (RFC Editor) · Primary source · 2022-08-01 · Section 2.2 (retrieved 2026-11-07)
- [8]
UDP lets programs send messages with a minimum of protocol machinery, but does not guarantee delivery or protect against duplicates; applications that need ordered, reliable delivery are told to use TCP. confirmedas of 1980-08-28
- RFC 768: User Datagram Protocol · IETF (RFC Editor) · Primary source · 1980-08-28 · Introduction (retrieved 2026-11-07)
- RFC 768: User Datagram Protocol · IETF (RFC Editor) · Primary source · 1980-08-28 · Introduction (retrieved 2026-11-07)
- [9]
QUIC, standardized by the IETF in 2021, is a secure, general-purpose, connection-oriented transport protocol built on UDP. confirmedas of 2021-05-01
- RFC 9000: QUIC: A UDP-Based Multiplexed and Secure Transport · IETF (RFC Editor) · Primary source · 2021-05-01 · Section 1, Overview (retrieved 2026-11-07)
- RFC 9000: QUIC: A UDP-Based Multiplexed and Secure Transport · IETF (RFC Editor) · Primary source · 2021-05-01 · Section 1, Overview (retrieved 2026-11-07)
- RFC 9000: QUIC: A UDP-Based Multiplexed and Secure Transport · IETF (RFC Editor) · Primary source · 2021-05-01 · Document title: QUIC: A UDP-Based Multiplexed and Secure Transport (retrieved 2026-11-07)
- [10]
IPv4 was first deployed on 1 January 1983 and is still the most commonly used version of IP; its addresses are 32-bit numbers usually written as four numbers separated by dots. confirmedas of 2026-11-07
- Number Resources · IANA · Primary source (retrieved 2026-11-07)
- [11]
IPv6, whose deployment began in 1999, enlarges IP addresses from 32 bits to 128 bits, allowing more levels of addressing hierarchy and a far greater number of addressable devices. confirmedas of 2026-11-07
- Number Resources · IANA · Primary source (retrieved 2026-11-07)
- RFC 8200: Internet Protocol, Version 6 (IPv6) Specification · IETF (RFC Editor) · Primary source · 2017-07-01 · Section 1, Introduction (retrieved 2026-11-07)
- [12]
IANA allocates pools of IP addresses to five Regional Internet Registries (AFRINIC, APNIC, ARIN, LACNIC and RIPE NCC); internet service providers obtain addresses from these or from local and national registries, and assign them to users. confirmedas of 2026-11-07
- Number Resources · IANA · Primary source (retrieved 2026-11-07)
- Number Resources · IANA · Primary source (retrieved 2026-11-07)
- Number Resources · IANA · Primary source · Registry table (retrieved 2026-11-07)
- [13]
An autonomous system (AS) is a connected group of IP address blocks run by one or more network operators under a single, clearly defined routing policy. confirmedas of 1996-03-01
- RFC 1930: Guidelines for creation, selection, and registration of an Autonomous System (AS) · IETF (RFC Editor) · Primary source · 1996-03-01 · Section 3 (retrieved 2026-11-07)
- [14]
The Internet Society describes an internet exchange point (IXP) as a physical, usually neutral location where networks meet to exchange local traffic through a switch, giving shorter and cheaper routes than sending local traffic abroad. reportedas of 2026-11-07
- Internet Exchange Points (IXPs) · Internet Society · Secondary source · What is an IXP? (retrieved 2026-11-07)
- Internet Exchange Points (IXPs) · Internet Society · Secondary source (retrieved 2026-11-07)
- [15]
The Domain Name System organizes names as a tree; each node has a label of up to 63 characters (octets). confirmedas of 1987-11-01
- RFC 1034: Domain Names - Concepts and Facilities · IETF (RFC Editor) · Primary source · 1987-11-01 · Section 3.1 (retrieved 2026-11-07)
- RFC 1034: Domain Names - Concepts and Facilities · IETF (RFC Editor) · Primary source · 1987-11-01 · Section 3.1 (retrieved 2026-11-07)
- [16]
In DNS, name servers hold information about part of the domain tree, usually complete information about one subset plus pointers to other name servers, and they may cache information about other parts. confirmedas of 1987-11-01
- RFC 1034: Domain Names - Concepts and Facilities · IETF (RFC Editor) · Primary source · 1987-11-01 · Section 2.4 (retrieved 2026-11-07)
- RFC 1034: Domain Names - Concepts and Facilities · IETF (RFC Editor) · Primary source · 1987-11-01 · Section 2.4 (retrieved 2026-11-07)
- [17]
DNS resolvers are programs that get answers from name servers for clients, either answering from one server's data or following referrals to other name servers. confirmedas of 1987-11-01
- RFC 1034: Domain Names - Concepts and Facilities · IETF (RFC Editor) · Primary source · 1987-11-01 · Section 2.4 (retrieved 2026-11-07)
- [18]
The DNS root zone is served by hundreds of servers in many countries, configured as 13 named authorities (a.root-servers.net to m.root-servers.net) run by organizations including Verisign, ICANN, NASA, the US Department of Defense, RIPE NCC and the WIDE Project. confirmedas of 2026-11-07
- Root Servers · IANA · Primary source (retrieved 2026-11-07)
- Root Servers · IANA · Primary source · List of Root Servers table (retrieved 2026-11-07)
- Root Servers · IANA · Primary source · List of Root Servers table (retrieved 2026-11-07)
- Root Servers · IANA · Primary source · List of Root Servers table (retrieved 2026-11-07)
- Root Servers · IANA · Primary source · List of Root Servers table (retrieved 2026-11-07)
- Root Servers · IANA · Primary source · List of Root Servers table (retrieved 2026-11-07)
- Root Servers · IANA · Primary source · List of Root Servers table (retrieved 2026-11-07)
- Root Servers · IANA · Primary source · List of Root Servers table, e.root-servers.net (retrieved 2026-11-07)
- Root Servers · IANA · Primary source · List of Root Servers table, g.root-servers.net (retrieved 2026-11-07)
- [19]
As of 7 November 2026 the root server system had 2,048 operational instances run by 12 independent root server operators. confirmedas of 2026-11-07
- Root Server Technical Operations Association · Root Server Operators · Primary source · Home page counter, timestamp 2026-11-07T22:37:48Z (retrieved 2026-11-07)
- [20]
The DNS Security Extensions (DNSSEC) add data origin authentication and data integrity to DNS, but do not provide confidentiality. confirmedas of 2005-03-01
- RFC 4033: DNS Security Introduction and Requirements · IETF (RFC Editor) · Primary source · 2005-03-01 · Abstract (retrieved 2026-11-07)
- RFC 4033: DNS Security Introduction and Requirements · IETF (RFC Editor) · Primary source · 2005-03-01 · Section 4 (retrieved 2026-11-07)
- [21]
The IETF has standardized ways to encrypt DNS traffic, including DNS over TLS (2016), which it says removes opportunities for eavesdropping and on-path tampering, and DNS over HTTPS (2018), which maps each query and response into an HTTP exchange. confirmedas of 2018-10-01
- RFC 7858: Specification for DNS over Transport Layer Security (TLS) · IETF (RFC Editor) · Primary source · 2016-05-01 · Abstract (retrieved 2026-11-07)
- RFC 8484: DNS Queries over HTTPS (DoH) · IETF (RFC Editor) · Primary source · 2018-10-01 · Abstract (retrieved 2026-11-07)
- [22]
ICANN was formed in 1998 and is a California-based nonprofit, public-benefit organization. confirmedas of 2026-11-07
- Welcome to ICANN! · ICANN · Primary source (retrieved 2026-11-07)
- Welcome to ICANN! · ICANN · Primary source (retrieved 2026-11-07)
- [23]
ICANN describes its policymaking as a multistakeholder, consensus-driven model in which individuals, businesses, civil society, governments and technologists take part, and says programmes run through its community have enabled the expansion of the DNS to more than 1,200 generic top-level domains. confirmedas of 2026-11-07
- Welcome to ICANN! · ICANN · Primary source (retrieved 2026-11-07)
- Welcome to ICANN! · ICANN · Primary source (retrieved 2026-11-07)
- [24]
IANA maintains the authoritative public registries of internet identifiers such as domain names, IP addresses and protocol codes; its services are free, and the functions are performed by Public Technical Identifiers (PTI), an ICANN affiliate. confirmedas of 2026-11-07
- [25]
On 1 October 2016 the contract under which ICANN performed the IANA functions for the US Commerce Department's NTIA expired, ending US government stewardship; ICANN described this as handing stewardship to the global internet community and the coordination of the internet's unique identifiers to the private sector. confirmedas of 2016-10-01
- Stewardship of IANA Functions Transitions to Global Internet Community as Contract with U.S. Government Ends · ICANN · Primary source · 2016-10-01 (retrieved 2026-11-07)
- Stewardship of IANA Functions Transitions to Global Internet Community as Contract with U.S. Government Ends · ICANN · Primary source · 2016-10-01 (retrieved 2026-11-07)
- Stewardship of IANA Functions Transitions to Global Internet Community as Contract with U.S. Government Ends · ICANN · Primary source · 2016-10-01 · Headline (retrieved 2026-11-07)
- Stewardship of IANA Functions Transitions to Global Internet Community as Contract with U.S. Government Ends · ICANN · Primary source · 2016-10-01 (retrieved 2026-11-07)
- [26]
ICANN's 2026 round of new generic top-level domain applications was open from 30 April to 12 August 2026, and on 7 October 2026 ICANN published the applications, reporting 1,615 in total, including 333 brand applications, in a snapshot whose final numbers are to be confirmed later. confirmedas of 2026-10-07
- New gTLD Program: Next Round · ICANN · Primary source (retrieved 2026-11-07)
- ICANN Reveals 2026 Round Applications for New Generic Top-Level Domains · ICANN · Primary source · 2026-10-07 · Reveal Day 2026 Data Snapshot (page text is in embedded JSON) (retrieved 2026-11-07)
- ICANN Reveals 2026 Round Applications for New Generic Top-Level Domains · ICANN · Primary source · 2026-10-07 (retrieved 2026-11-07)
- ICANN Reveals 2026 Round Applications for New Generic Top-Level Domains · ICANN · Primary source · 2026-10-07 · Reveal Day 2026 Data Snapshot (retrieved 2026-11-07)
- [27]
The ITU says submarine telecom cables carry over 99% of international data exchange. confirmedas of 2026-11-07
- Submarine telecommunication cables · International Telecommunication Union · Primary source (retrieved 2026-11-07)
- [28]
Cable faults are common; the International Cable Protection Committee recorded over 200 cable repairs worldwide in 2023, and TeleGeography cites ICPC data of roughly 200 faults a year. confirmedas of 2026-11-07
- Submarine telecommunication cables · International Telecommunication Union · Primary source (retrieved 2026-11-07)
- Submarine Cable Frequently Asked Questions · TeleGeography · Secondary source · Don't these cables ever break? (retrieved 2026-11-07)
- [29]
Accidental human activity, mainly fishing and ships dragging anchors, causes most cable faults; TeleGeography puts these accidents at about two-thirds of faults and calls deliberate sabotage exceedingly rare. confirmedas of 2026-11-07
- Submarine Cable Frequently Asked Questions · TeleGeography · Secondary source · Don't these cables ever break? (retrieved 2026-11-07)
- Submarine Cable Frequently Asked Questions · TeleGeography · Secondary source · Don't these cables ever break? (retrieved 2026-11-07)
- Submarine telecommunication cables · International Telecommunication Union · Primary source (retrieved 2026-11-07)
- [30]
A passive optical network links an optical line termination (OLT) on the provider's side to optical network units or terminals (ONU/ONT) at customer premises through a passive tree of fibres and splitters, in a one-to-many arrangement. confirmedas of 2008-03-01
- Recommendation ITU-T G.984.1 (03/2008): Gigabit-capable passive optical networks (GPON): General characteristics · ITU-T · Primary source · 2008-03-01 · Section 1, Scope (retrieved 2026-11-07)
- Recommendation ITU-T G.984.1 (03/2008): Gigabit-capable passive optical networks (GPON): General characteristics · ITU-T · Primary source · 2008-03-01 · Section 1, Scope (retrieved 2026-11-07)
- Recommendation ITU-T G.984.1 (03/2008): Gigabit-capable passive optical networks (GPON): General characteristics · ITU-T · Primary source · 2008-03-01 · Section 3.2.6, optical distribution network (retrieved 2026-11-07)
- [31]
The ITU's GPON standard (G.984.1) describes a fibre access network for homes and businesses with nominal line rates of 2.4 Gbit/s downstream and 1.2 or 2.4 Gbit/s upstream. confirmedas of 2008-03-01
- Recommendation ITU-T G.984.1 (03/2008): Gigabit-capable passive optical networks (GPON): General characteristics · ITU-T · Primary source · 2008-03-01 · Summary, p. i (retrieved 2026-11-07)
- [32]
The ITU's XGS-PON standard (G.9807.1) describes a point-to-multipoint fibre system running at a nominal 10 Gbit/s both downstream and upstream, for residential, business, mobile backhaul and other uses. confirmedas of 2023-02-01
- Recommendation ITU-T G.9807.1 (02/2023): 10-Gigabit-capable symmetric passive optical network (XGS-PON) · ITU-T · Primary source · 2023-02-01 · Summary (retrieved 2026-11-07)
- Recommendation ITU-T G.9807.1 (02/2023): 10-Gigabit-capable symmetric passive optical network (XGS-PON) · ITU-T · Primary source · 2023-02-01 · Summary (retrieved 2026-11-07)
- [33]
Wi-Fi is based on the IEEE 802.11 family of standards, which specify the medium access control (MAC) and physical (PHY) layers for wireless local area networks. confirmedas of 2026-11-07
- IEEE 802.11-2020 · IEEE Standards Association · Primary source (retrieved 2026-11-07)
- [34]
In rules published in May 2020, the FCC opened the whole 6 GHz band (5.925-7.125 GHz) in the US to unlicensed indoor low-power access points, allowed higher-power standard access points in parts of the band under an automated frequency coordination (AFC) system that protects fixed microwave links, and enabled channels up to 320 MHz wide. confirmedas of 2020-05-26
- Unlicensed Use of the 6 GHz Band (final rule) · Federal Register (FCC) · Primary source · 2020-05-26 · Summary (retrieved 2026-11-07)
- Unlicensed Use of the 6 GHz Band (final rule) · Federal Register (FCC) · Primary source · 2020-05-26 · Summary (retrieved 2026-11-07)
- Unlicensed Use of the 6 GHz Band (final rule) · Federal Register (FCC) · Primary source · 2020-05-26 · Rule text, definitions (retrieved 2026-11-07)
- Unlicensed Use of the 6 GHz Band (final rule) · Federal Register (FCC) · Primary source · 2020-05-26 · Paragraph 2 (retrieved 2026-11-07)
- [35]
The Wi-Fi Alliance introduced Wi-Fi 7 certification in 2024; it says Wi-Fi 7 works across the 2.4, 5 and 6 GHz bands and adds 320 MHz channels in the 6 GHz band (twice the throughput of Wi-Fi 6), multi-link operation that spreads traffic across links, and 4K QAM, which it says gives 20% higher transmission rates than Wi-Fi 6's 1024 QAM. confirmedas of 2026-11-07
- Wi-Fi CERTIFIED 7 · Wi-Fi Alliance · Primary source (retrieved 2026-11-07)
- Wi-Fi CERTIFIED 7 · Wi-Fi Alliance · Primary source (retrieved 2026-11-07)
- Wi-Fi CERTIFIED 7 · Wi-Fi Alliance · Primary source (retrieved 2026-11-07)
- [36]
The 3rd Generation Partnership Project (3GPP) unites seven telecommunications standards organisations, ARIB, ATIS, CCSA, ETSI, TSDSI, TTA and TTC, known as Organizational Partners. confirmedas of 2026-11-07
- Introducing 3GPP · 3GPP · Primary source (retrieved 2026-11-07)
- [37]
The Organizational Partners come from Japan (ARIB and TTC), the United States (ATIS), China (CCSA), Europe (ETSI), India (TSDSI) and Korea (TTA), and they set 3GPP's general policy and strategy. confirmedas of 2026-11-07
- Partners · 3GPP · Primary source (retrieved 2026-11-07)
- Partners · 3GPP · Primary source (retrieved 2026-11-07)
- Partners · 3GPP · Primary source (retrieved 2026-11-07)
- Partners · 3GPP · Primary source (retrieved 2026-11-07)
- Partners · 3GPP · Primary source (retrieved 2026-11-07)
- Partners · 3GPP · Primary source (retrieved 2026-11-07)
- Partners · 3GPP · Primary source (retrieved 2026-11-07)
- Partners · 3GPP · Primary source (retrieved 2026-11-07)
- [38]
3GPP defines 5G as the system specified from its Release 15, which was functionally frozen in June 2018 and fully specified by September 2019. confirmedas of 2026-11-07
- 5G System Overview · 3GPP · Primary source (retrieved 2026-11-07)
- [39]
The ITU estimates 5G covered 55% of the world's population in 2025, including 84% of people in high-income countries but only 4% in low-income countries. confirmedas of 2025-10-15
- Facts and Figures 2025: Mobile network coverage · International Telecommunication Union · Primary source · 2025-10-15 (retrieved 2026-11-07)
- Facts and Figures 2025: Mobile network coverage · International Telecommunication Union · Primary source · 2025-10-15 (retrieved 2026-11-07)
- [40]
As for earlier generations, the ITU defines the 6G calendar and 3GPP develops technology as its candidate for the ITU's IMT process; the ITU has set early 2029 for technology proposals for IMT-2030 and mid-2030 at the latest for full specifications. confirmedas of 2026-03-31
- Release 20 · 3GPP · Primary source (retrieved 2026-11-07)
- Release 20 · 3GPP · Primary source (retrieved 2026-11-07)
- [41]
The ITU has invited candidate 6G radio interface technologies for IMT-2030 to be submitted between February 2027 and February 2029, and has scheduled an IMT-2030 workshop in Geneva on 12 February 2027. confirmedas of 2026-11-07
- IMT-2030 (Working Party 5D) · International Telecommunication Union · Primary source (retrieved 2026-11-07)
- IMT-2030 (Working Party 5D) · International Telecommunication Union · Primary source (retrieved 2026-11-07)
- [42]
Geostationary (GEO) satellites orbit about 35,786 km above the equator, matching Earth's rotation so they appear fixed in the sky; this suits telecommunication satellites because ground antennas can stay pointed in one direction, and three evenly spaced satellites can give near-global coverage. confirmedas of 2026-11-07
- Types of orbits · European Space Agency · Primary source · Geostationary orbit (GEO) (retrieved 2026-11-07)
- Types of orbits · European Space Agency · Primary source · Geostationary orbit (GEO) (retrieved 2026-11-07)
- Types of orbits · European Space Agency · Primary source · Geostationary orbit (GEO) (retrieved 2026-11-07)
- Types of orbits · European Space Agency · Primary source · Geostationary orbit (GEO) (retrieved 2026-11-07)
- [43]
Low Earth orbit (LEO) is generally taken to mean altitudes below 2,000 km; LEO satellites travel at about 7.8 km per second and circle Earth in about 90 minutes, so communications satellites there usually work as constellations to give continuous coverage. confirmedas of 2026-11-07
- Types of orbits · European Space Agency · Primary source · Low Earth orbit (LEO) (retrieved 2026-11-07)
- Types of orbits · European Space Agency · Primary source · Low Earth orbit (LEO) (retrieved 2026-11-07)
- Types of orbits · European Space Agency · Primary source · Low Earth orbit (LEO) (retrieved 2026-11-07)
- [44]
In its 2020 Rural Digital Opportunity Fund auction, the FCC defined low latency as 100 milliseconds or less and high latency as up to 750 milliseconds, and barred applicants using geostationary, high or medium Earth orbit satellites from bidding in the low-latency category, while letting LEO applicants try to show they could meet it. confirmedas of 2020-06-18
- Rural Digital Opportunity Fund Phase I Auction Scheduled for October 29, 2020; Notice and Filing Requirements and Other Procedures for Auction 904 · Federal Register (FCC) · Primary source · 2020-06-18 · Latency requirement table (retrieved 2026-11-07)
- Rural Digital Opportunity Fund Phase I Auction Scheduled for October 29, 2020; Notice and Filing Requirements and Other Procedures for Auction 904 · Federal Register (FCC) · Primary source · 2020-06-18 · Latency requirement table (retrieved 2026-11-07)
- Rural Digital Opportunity Fund Phase I Auction Scheduled for October 29, 2020; Notice and Filing Requirements and Other Procedures for Auction 904 · Federal Register (FCC) · Primary source · 2020-06-18 · Paragraph 79 (retrieved 2026-11-07)
- Rural Digital Opportunity Fund Phase I Auction Scheduled for October 29, 2020; Notice and Filing Requirements and Other Procedures for Auction 904 · Federal Register (FCC) · Primary source · 2020-06-18 (retrieved 2026-11-07)
- [45]
SpaceX reported a median Starlink latency of about 25 milliseconds and a median peak-hour download speed of 225 Mbps for residential users as of 31 March 2026. confirmedas of 2026-03-31
- Space Exploration Technologies Corp. final prospectus (Form 424B4) · SpaceX (SEC filing) · Primary source · 2026-06-12 (retrieved 2026-11-07)
- Space Exploration Technologies Corp. final prospectus (Form 424B4) · SpaceX (SEC filing) · Primary source · 2026-06-12 (retrieved 2026-11-07)
- [46]
SpaceX reported 13.6 million Starlink consumer subscribers as of September 30, 2026, up from 7.2 million a year earlier, counting each unique service line as a subscriber. confirmedas of 2026-09-30
- Space Exploration Technologies Corp. Form 10-Q for the quarter ended September 30, 2026 · SpaceX (SEC filing) · Primary source · 2026-10-22 (retrieved 2026-11-07)
- Space Exploration Technologies Corp. Form 10-Q for the quarter ended September 30, 2026 · SpaceX (SEC filing) · Primary source · 2026-10-22 (retrieved 2026-11-07)
- [47]
Radio spectrum is the continuum of frequencies used for wireless services; because bands are allocated to specific services, not every frequency is available to every user or use, and spectrum is often described as a finite and valuable resource. confirmedas of 2026-02-23
- History of the Federal Communications Commission's Spectrum Auction Authority: 1993-2025 (R48861) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-23 · Summary (retrieved 2026-11-07)
- History of the Federal Communications Commission's Spectrum Auction Authority: 1993-2025 (R48861) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-23 · Summary (retrieved 2026-11-07)
- [48]
The ITU traces its founding to 17 May 1865, when 20 founding members signed the first International Telegraph Convention in Paris and set up the International Telegraph Union to supervise later amendments to the agreement; it describes its history as spanning advances from telegraphy to satellites, mobile phones and the internet. confirmedas of 2026-11-07
- Overview of ITU's history · ITU · Primary source (retrieved 2026-11-07)
- Overview of ITU's history · ITU · Primary source (retrieved 2026-11-07)
- [49]
The ITU's Radio Regulations are the international treaty governing use of the radio spectrum and of geostationary and non-geostationary satellite orbits; World Radiocommunication Conferences revise them every three to four years. confirmedas of 2026-11-07
- World Radiocommunication Conferences (WRC) · ITU · Primary source (retrieved 2026-11-07)
- [50]
The ITU's 2026 Plenipotentiary Conference (PP-26) is scheduled for Doha, Qatar, from 9 to 27 November 2026. confirmedas of 2026-11-07
- ITU Plenipotentiary Conference 2026 (PP-26) · ITU · Primary source (retrieved 2026-11-07)
- [51]
In the United States the FCC manages non-federal use of spectrum, licensing users and setting terms to avoid interference, while the National Telecommunications and Information Administration (NTIA) manages federal use. confirmedas of 2026-02-23
- History of the Federal Communications Commission's Spectrum Auction Authority: 1993-2025 (R48861) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-23 · Introduction (retrieved 2026-11-07)
- History of the Federal Communications Commission's Spectrum Auction Authority: 1993-2025 (R48861) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-23 · Introduction (retrieved 2026-11-07)
- [52]
The Communications Act of 1934 created the Federal Communications Commission to regulate interstate and foreign communication by wire and radio, with the aim of making rapid, efficient nationwide and worldwide service available to all people of the United States at reasonable charges. confirmedas of 2026-11-07
- 47 U.S.C. 151: Purposes of chapter; Federal Communications Commission created · govinfo (US Code) · Primary source · 47 U.S.C. 151 (retrieved 2026-11-07)
- 47 U.S.C. 151: Purposes of chapter; Federal Communications Commission created · govinfo (US Code) · Primary source · 47 U.S.C. 151 (retrieved 2026-11-07)
- 47 U.S.C. 151: Purposes of chapter; Federal Communications Commission created · govinfo (US Code) · Primary source · 47 U.S.C. 151 (retrieved 2026-11-07)
- Federal Communications Commission · Federal Register · Primary source (retrieved 2026-11-07)
- [53]
The FCC has five commissioners appointed by the President with the Senate's advice and consent, one of whom the President designates as chair. confirmedas of 2026-11-07
- 47 U.S.C. 154: Federal Communications Commission · govinfo (US Code) · Primary source · 47 U.S.C. 154(a) (retrieved 2026-11-07)
- [54]
By law, no more FCC commissioners may belong to the same political party than the smallest number that makes a majority of the full commission, which on a five-member commission is three. confirmedas of 2026-11-07
- 47 U.S.C. 154: Federal Communications Commission · govinfo (US Code) · Primary source · 47 U.S.C. 154(b)(5) (retrieved 2026-11-07)
- [55]
Under 47 U.S.C. 309(j), when mutually exclusive applications are accepted for an initial licence, the FCC must award it through competitive bidding; licences for public safety radio services and the digital television licences given to existing broadcasters are among the exemptions. confirmedas of 2026-11-07
- 47 U.S.C. 309 - Action upon applications; form of and conditions attached to licenses · U.S. Government Publishing Office (govinfo) · Primary source · 47 U.S.C. 309(j)(1) (retrieved 2026-11-07)
- 47 U.S.C. 309 - Action upon applications; form of and conditions attached to licenses · U.S. Government Publishing Office (govinfo) · Primary source · 47 U.S.C. 309(j)(2)(A) (retrieved 2026-11-07)
- 47 U.S.C. 309 - Action upon applications; form of and conditions attached to licenses · U.S. Government Publishing Office (govinfo) · Primary source · 47 U.S.C. 309(j)(2)(B) (retrieved 2026-11-07)
- [56]
After short extensions, the FCC's general auction authority lapsed on 9 March 2023, the first lapse in its 30-year history, and for nearly two years the FCC could not auction spectrum, though companies could still buy spectrum on the secondary market. confirmedas of 2026-02-25
- Spectrum Provisions in P.L. 119-21, the FY2025 Reconciliation Law (R48862) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-25 · Background (retrieved 2026-11-07)
- Spectrum Provisions in P.L. 119-21, the FY2025 Reconciliation Law (R48862) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-25 · Background (retrieved 2026-11-07)
- History of the Federal Communications Commission's Spectrum Auction Authority: 1993-2025 (R48861) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-23 · 117th Congress (retrieved 2026-11-07)
- History of the Federal Communications Commission's Spectrum Auction Authority: 1993-2025 (R48861) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-23 · 117th Congress (retrieved 2026-11-07)
- [57]
The FY2025 reconciliation law (P.L. 119-21), enacted on 4 July 2025, reinstated the FCC's general auction authority through 30 September 2034 in Title IV, Section 40002, while excluding the 3.1-3.45 GHz and 7.4-8.4 GHz bands from auction. confirmedas of 2026-02-25
- Spectrum Provisions in P.L. 119-21, the FY2025 Reconciliation Law (R48862) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-25 · Section 40002 provisions (retrieved 2026-11-07)
- History of the Federal Communications Commission's Spectrum Auction Authority: 1993-2025 (R48861) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-23 · Summary (retrieved 2026-11-07)
- [58]
Mid-band auctions have raised the most money; the 2021 C-band auction (3.7-3.98 GHz) generated $81 billion, the highest to date, and the 2015 AWS-3 auction generated nearly $42 billion. confirmedas of 2026-02-25
- Spectrum Provisions in P.L. 119-21, the FY2025 Reconciliation Law (R48862) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-25 · Issues for Congress (retrieved 2026-11-07)
- Spectrum Provisions in P.L. 119-21, the FY2025 Reconciliation Law (R48862) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-25 · Footnotes (retrieved 2026-11-07)
- Spectrum Provisions in P.L. 119-21, the FY2025 Reconciliation Law (R48862) · Congressional Research Service (via EveryCRSReport) · Primary source · 2026-02-25 · Footnotes (retrieved 2026-11-07)
- [59]
The Sixth Circuit describes net-neutrality policies as rules that stop broadband providers from controlling users' internet access, for example by varying speeds or blocking connections to websites, based on content, commercial agreements or other reasons. confirmedas of 2025-01-02
- In re: MCP No. 185; Ohio Telecom Association v. FCC, No. 24-7000 (opinion) · United States Court of Appeals for the Sixth Circuit · Primary source · 2025-01-02 · Opinion, pp. 2-3 (retrieved 2026-11-07)
- [60]
The FCC's 2015 Open Internet Order banned blocking, throttling and paid prioritisation, added a general rule against unreasonable interference, enhanced transparency, applied to fixed and mobile broadband, and reclassified broadband as a Title II telecommunications service while forbearing from most Title II provisions. confirmedas of 2015-04-13
- Protecting and Promoting the Open Internet (80 FR 19738) · Federal Register (Federal Communications Commission) · Primary source · 2015-04-13 · Summary (retrieved 2026-11-07)
- Protecting and Promoting the Open Internet (80 FR 19738) · Federal Register (Federal Communications Commission) · Primary source · 2015-04-13 · Summary (retrieved 2026-11-07)
- Protecting and Promoting the Open Internet (80 FR 19738) · Federal Register (Federal Communications Commission) · Primary source · 2015-04-13 · Summary (retrieved 2026-11-07)
- Protecting and Promoting the Open Internet (80 FR 19738) · Federal Register (Federal Communications Commission) · Primary source · 2015-04-13 · Summary (retrieved 2026-11-07)
- [61]
The FCC's Restoring Internet Freedom Order, published in February 2018, reclassified broadband as a lightly regulated information service, kept a rule requiring providers to disclose network management practices, performance and commercial terms, and eliminated the conduct rules, finding transparency sufficient and the conduct rules' costs greater than their benefits. confirmedas of 2018-02-22
- Restoring Internet Freedom (83 FR 7852) · Federal Register (Federal Communications Commission) · Primary source · 2018-02-22 · Summary (retrieved 2026-11-07)
- Restoring Internet Freedom (83 FR 7852) · Federal Register (Federal Communications Commission) · Primary source · 2018-02-22 · Summary (retrieved 2026-11-07)
- Restoring Internet Freedom (83 FR 7852) · Federal Register (Federal Communications Commission) · Primary source · 2018-02-22 · Summary (retrieved 2026-11-07)
- [62]
The FCC's 2024 Safeguarding and Securing the Open Internet Order, published on 22 May 2024, again classified broadband as a Title II telecommunications service, with broad forbearance, and reinstated rules against blocking, throttling and paid or affiliated prioritisation; the FCC said the classification would help it safeguard national security, advance public safety and protect consumers. confirmedas of 2024-05-22
- Safeguarding and Securing the Open Internet; Restoring Internet Freedom (89 FR 45404) · Federal Register (Federal Communications Commission) · Primary source · 2024-05-22 · Summary (retrieved 2026-11-07)
- Safeguarding and Securing the Open Internet; Restoring Internet Freedom (89 FR 45404) · Federal Register (Federal Communications Commission) · Primary source · 2024-05-22 · Summary (retrieved 2026-11-07)
- Safeguarding and Securing the Open Internet; Restoring Internet Freedom (89 FR 45404) · Federal Register (Federal Communications Commission) · Primary source · 2024-05-22 · Summary (retrieved 2026-11-07)
- Safeguarding and Securing the Open Internet; Restoring Internet Freedom (89 FR 45404) · Federal Register (Federal Communications Commission) · Primary source · 2024-05-22 · Summary (retrieved 2026-11-07)
- [63]
On 2 January 2025 the Sixth Circuit held that broadband providers offer only an "information service", that the FCC lacked statutory authority to impose its net-neutrality rules through the telecommunications-service provision, and that mobile broadband cannot be classed as a commercial mobile service; it set the 2024 order aside. confirmedas of 2025-01-02
- In re: MCP No. 185; Ohio Telecom Association v. FCC, No. 24-7000 (opinion) · United States Court of Appeals for the Sixth Circuit · Primary source · 2025-01-02 · Opinion, p. 3 (retrieved 2026-11-07)
- In re: MCP No. 185; Ohio Telecom Association v. FCC, No. 24-7000 (opinion) · United States Court of Appeals for the Sixth Circuit · Primary source · 2025-01-02 · Opinion, p. 4 (retrieved 2026-11-07)
- Delete, Delete, Delete; Safeguarding and Securing the Open Internet; Restoring Internet Freedom (90 FR 38406) · Federal Register (Federal Communications Commission) · Primary source · 2025-08-08 · Supplementary information (retrieved 2026-11-07)
- [64]
Because of the stay and the ruling, the FCC says the 2024 rules never went into effect; in an order published on 8 August 2025 its Wireline Competition Bureau restored the affected parts of the Code of Federal Regulations to how they would read without the 2024 changes. confirmedas of 2025-08-08
- Delete, Delete, Delete; Safeguarding and Securing the Open Internet; Restoring Internet Freedom (90 FR 38406) · Federal Register (Federal Communications Commission) · Primary source · 2025-08-08 · Supplementary information (retrieved 2026-11-07)
- Delete, Delete, Delete; Safeguarding and Securing the Open Internet; Restoring Internet Freedom (90 FR 38406) · Federal Register (Federal Communications Commission) · Primary source · 2025-08-08 · Supplementary information (retrieved 2026-11-07)
- [65]
Before 1996 universal service relied mainly on implicit subsidies built into regulated rates; the Telecommunications Act of 1996 replaced them with explicit payments, and Section 254 requires every carrier providing interstate telecommunications services to contribute to the Universal Service Fund. confirmedas of 2025-06-27
- Federal Communications Commission v. Consumers' Research, No. 24-354 (2025) · Supreme Court of the United States (via Cornell LII) · Primary source · 2025-06-27 · Opinion of the Court, Part I-A (retrieved 2026-11-07)
- Federal Communications Commission v. Consumers' Research, No. 24-354 (2025) · Supreme Court of the United States (via Cornell LII) · Primary source · 2025-06-27 · Opinion of the Court, Part I-A (retrieved 2026-11-07)
- Universal Service · Universal Service Administrative Company · Primary source (retrieved 2026-11-07)
- [66]
The FCC runs four universal-service programs, Lifeline, High Cost, E-Rate (schools and libraries) and Rural Health Care, which the Universal Service Administrative Company (USAC) administers. confirmedas of 2026-11-07
- Federal Communications Commission v. Consumers' Research, No. 24-354 (2025) · Supreme Court of the United States (via Cornell LII) · Primary source · 2025-06-27 · Opinion of the Court, Part I-A (retrieved 2026-11-07)
- Universal Service · Universal Service Administrative Company · Primary source (retrieved 2026-11-07)
- [67]
On 27 June 2025, in FCC v. Consumers' Research, the Supreme Court ruled 6-3 that the universal-service contribution scheme does not violate the nondelegation doctrine, reversing the Fifth Circuit; Justice Kagan wrote for the Court. confirmedas of 2025-06-27
- Federal Communications Commission v. Consumers' Research, No. 24-354 (2025) · Supreme Court of the United States (via Cornell LII) · Primary source · 2025-06-27 · Syllabus (retrieved 2026-11-07)
- Federal Communications Commission v. Consumers' Research, No. 24-354 (2025) · Supreme Court of the United States (via Cornell LII) · Primary source · 2025-06-27 · Syllabus (retrieved 2026-11-07)
- Supreme Court upholds FCC universal service program · Roll Call · Secondary source · 2025-06-27 (retrieved 2026-11-07)
- Supreme Court upholds FCC universal service program · Roll Call · Secondary source · 2025-06-27 (retrieved 2026-11-07)
- [68]
The Broadband Equity, Access, and Deployment (BEAD) Program is a $42.45 billion federal grant program, funded by the Infrastructure Investment and Jobs Act, that aims to connect every American to high-speed internet by funding infrastructure. confirmedas of 2026-11-07
- Broadband Equity, Access, and Deployment (BEAD) Program · National Telecommunications and Information Administration · Primary source · Program overview (retrieved 2026-11-07)
- [69]
The Telephone Consumer Protection Act (47 U.S.C. 227) makes it unlawful, except for emergencies or with the called party's prior express consent, to call a mobile phone using an autodialer or an artificial or prerecorded voice. confirmedas of 2026-11-07
- 47 U.S.C. 227 - Restrictions on use of telephone equipment · U.S. Government Publishing Office (govinfo) · Primary source · 47 U.S.C. 227(b)(1)(A) (retrieved 2026-11-07)
- 47 U.S.C. 227 - Restrictions on use of telephone equipment · U.S. Government Publishing Office (govinfo) · Primary source · 47 U.S.C. 227(b)(1)(A)(iii) (retrieved 2026-11-07)
- [70]
The TRACED Act required the FCC, within 18 months, to make voice providers implement the STIR/SHAKEN caller ID authentication framework in their internet protocol networks and take reasonable measures to authenticate calls on older non-IP networks. confirmedas of 2019-12-30
- Public Law 116-105, Pallone-Thune TRACED Act · U.S. Government Publishing Office (govinfo) · Primary source · 2019-12-30 · Sec. 4(b)(1) (retrieved 2026-11-07)
- Public Law 116-105, Pallone-Thune TRACED Act · U.S. Government Publishing Office (govinfo) · Primary source · 2019-12-30 · Sec. 4(b)(1)(B) (retrieved 2026-11-07)
- [71]
Under STIR/SHAKEN the caller's provider adds an "Identity" header to the SIP message that sets up the call, containing encrypted identifying information and the location of a public key; the receiving provider's verification service uses that key to check the caller ID. confirmedas of 2020-04-21
- Call Authentication Trust Anchor; Implementation of TRACED Act (85 FR 22029) · Federal Register (Federal Communications Commission) · Primary source · 2020-04-21 · Background (retrieved 2026-11-07)
- Call Authentication Trust Anchor; Implementation of TRACED Act (85 FR 22029) · Federal Register (Federal Communications Commission) · Primary source · 2020-04-21 · Background (retrieved 2026-11-07)
- [72]
Because STIR/SHAKEN travels in SIP signalling, it works only on IP portions of networks; if a call crosses a network that cannot carry SIP, the Identity header is lost. confirmedas of 2020-04-21
- Call Authentication Trust Anchor; Implementation of TRACED Act (85 FR 22029) · Federal Register (Federal Communications Commission) · Primary source · 2020-04-21 · Background (retrieved 2026-11-07)
- Call Authentication Trust Anchor; Implementation of TRACED Act (85 FR 22029) · Federal Register (Federal Communications Commission) · Primary source · 2020-04-21 · Background (retrieved 2026-11-07)
- [73]
In fiscal year 2025 the FTC received over 2.6 million Do Not Call complaints, and the Registry held over 258 million active registrations; the complaints are unverified reports, not a survey. confirmedas of 2025-09-30
- National Do Not Call Registry Data Book for Fiscal Year 2025 · Federal Trade Commission · Primary source (retrieved 2026-11-07)
- National Do Not Call Registry Data Book for Fiscal Year 2025 · Federal Trade Commission · Primary source (retrieved 2026-11-07)
- [74]
The UN human rights office (OHCHR) defines internet shutdowns as measures taken by or for a government to intentionally disrupt access to and use of online information and communications systems, including restricting connectivity at large or blocking services such as social media and messaging. confirmedas of 2022-05-13
- Internet shutdowns: trends, causes, legal implications and impacts on a range of human rights (A/HRC/50/55) · Office of the UN High Commissioner for Human Rights (UN Human Rights Council document) · Primary source · 2022-05-13 · Para. 4 (retrieved 2026-11-07)
- Internet shutdowns: trends, causes, legal implications and impacts on a range of human rights (A/HRC/50/55) · Office of the UN High Commissioner for Human Rights (UN Human Rights Council document) · Primary source · 2022-05-13 · Para. 4 (retrieved 2026-11-07)
- [75]
OHCHR says shutdowns range from complete blocks to throttling bandwidth or limiting mobile service to 2G, blocking virtual private networks, and sometimes cutting entire telephone networks. confirmedas of 2022-05-13
- Internet shutdowns: trends, causes, legal implications and impacts on a range of human rights (A/HRC/50/55) · Office of the UN High Commissioner for Human Rights (UN Human Rights Council document) · Primary source · 2022-05-13 · Para. 5 (retrieved 2026-11-07)
- Internet shutdowns: trends, causes, legal implications and impacts on a range of human rights (A/HRC/50/55) · Office of the UN High Commissioner for Human Rights (UN Human Rights Council document) · Primary source · 2022-05-13 · Para. 5 (retrieved 2026-11-07)
- Internet shutdowns: trends, causes, legal implications and impacts on a range of human rights (A/HRC/50/55) · Office of the UN High Commissioner for Human Rights (UN Human Rights Council document) · Primary source · 2022-05-13 · Para. 5 (retrieved 2026-11-07)
- Internet shutdowns: trends, causes, legal implications and impacts on a range of human rights (A/HRC/50/55) · Office of the UN High Commissioner for Human Rights (UN Human Rights Council document) · Primary source · 2022-05-13 · Para. 5 (retrieved 2026-11-07)
- [76]
OHCHR recommended that states refrain from the full range of internet shutdowns, citing their indiscriminate and disproportionate impact on human rights. confirmedas of 2022-05-13
- Internet shutdowns: trends, causes, legal implications and impacts on a range of human rights (A/HRC/50/55) · Office of the UN High Commissioner for Human Rights (UN Human Rights Council document) · Primary source · 2022-05-13 · Para. 66 (retrieved 2026-11-07)
- [77]
Access Now and the #KeepItOn coalition counted at least 313 internet shutdowns in 52 countries in 2025, up from 304 in 2024 and the highest number they have recorded. confirmedas of 2026-03-31
- Rising and resisting in the darkness: internet shutdowns in 2025 · Access Now · Secondary source · 2026-03-31 (retrieved 2026-11-07)
- Rising repression meets global resistance: internet shutdowns in 2025 (#KeepItOn annual report) · Access Now · Primary source · 2026-03-31 · Rising repression meets global resistance, p. 5 (retrieved 2026-11-14)
- [78]
ICANN says it does not control content on the internet and cannot stop spam. confirmedas of 2026-11-07
- What Does ICANN Do? · ICANN · Primary source (retrieved 2026-11-07)
- [79]
Every DNS record carries a time-to-live (TTL) that limits how long it may be kept in a cache. confirmedas of 1987-11-01
- RFC 1034: Domain Names - Concepts and Facilities · IETF (RFC Editor) · Primary source · 1987-11-01 · Section 3.6 (retrieved 2026-11-07)
- [80]
Each quarter the FCC sets a "contribution factor", the fund's projected expenses divided by contributing carriers' projected revenue; each carrier pays its projected revenue multiplied by the factor and may pass the cost on to customers. confirmedas of 2025-06-27
- Federal Communications Commission v. Consumers' Research, No. 24-354 (2025) · Supreme Court of the United States (via Cornell LII) · Primary source · 2025-06-27 · Opinion of the Court, Part I-A (retrieved 2026-11-07)
- Federal Communications Commission v. Consumers' Research, No. 24-354 (2025) · Supreme Court of the United States (via Cornell LII) · Primary source · 2025-06-27 · Opinion of the Court, Part I-A (retrieved 2026-11-07)
- Federal Communications Commission v. Consumers' Research, No. 24-354 (2025) · Supreme Court of the United States (via Cornell LII) · Primary source · 2025-06-27 · Opinion of the Court, Part I-A (retrieved 2026-11-07)
- Federal Communications Commission v. Consumers' Research, No. 24-354 (2025) · Supreme Court of the United States (via Cornell LII) · Primary source · 2025-06-27 · Opinion of the Court, Part I-A (retrieved 2026-11-07)
- [81]
3GPP describes Release 20 as the final "5G-Advanced only" release; in March 2026 it had 126 work items and 74 study items for 5G-Advanced under way, alongside early 6G studies. confirmedas of 2026-03-31
- Release 20 · 3GPP · Primary source (retrieved 2026-11-07)
- Release 20 · 3GPP · Primary source (retrieved 2026-11-07)
Revision history (2)
- Narrowed the net neutrality FAQ to the FCC rules, which is what its sources cover.
- Page created.
Created Nov 8, 2026. Last reviewed by an editor on Nov 8, 2026. Next scheduled review: Dec 1, 2026.
Cite this page
"Internet and telecoms: a crash course." ContentLora, updated Nov 14, 2026. https://contentlora.com/explain/internet-telecom
Spotted an error? Suggest a correction or emailcorrections@contentlora.com.